
Temirzhan Nurpeisov
Furniture assembly carpenter11 years
★ 4.81 · 47 ratings
For business · Retail
We make shelving for your goods, warehouse or niche: shelf spacing, depth and frame are calculated from the weight and dimensions of what will go on them. Measurement and 3D design are free, the price is fixed in the contract before we start, warranty 24 months.
Measurement and 3D design are free and carry no obligation · price fixed in the contract · Kaspi Instalments up to 24 months
01Types
02Projects
Scope, materials and lead time — for each project.
03How we work with stores
04Prices
The "from" price is for a shelving unit of base size; the total depends on height, number of shelves, frame and material. The exact estimate is fixed in the contract after a free measurement, and it doesn't change during the work.
05For legal entities
We work with LLPs and sole proprietors on bank transfer. Price, materials and lead times — in the contract before production starts.
Request a contract and invoice06Principles






01 / 06
07Production
Six steps in our 600 m² workshop. You can see each of them with your own eyes: the showroom and production are under one roof.
08Team
MEBLIX workshop craftsmen who make and assemble furniture to order.
01 / 0709FAQ
Didn’t find the answer? Message us — a manager replies, not a bot.
Ask on WhatsAppWe build the load into the project in advance: we ask what will stand on the shelves and choose the board thickness, span between uprights and frame accordingly. For heavy boxes in the back room we use a metal frame and a short span; for books and decor at home, 18 mm laminated chipboard is enough.
Yes, we make shelving for a niche by measuring the opening at several points, so crooked walls and height differences are accounted for in the drawing. We follow a sloped ceiling with the top shelf or a box, and no gaps remain between the shelving and the wall.
The lead time depends on the type and material, and for each option it is stated in the price list on this page. If you have a hard date for a store opening or a move, tell the manager — a rush order is possible.
For boxes and stock, a metal frame with plywood or steel shelves is more reliable: it holds more weight and isn't afraid of a damp back room. Laminated chipboard shelving is suitable for a sales floor and at home, where the look and color of the shelves matter.
Yes: we sign a contract, issue an invoice, and the company pays by bank transfer in two stages — half before the workshop starts, half after the acceptance act. After installation we hand over the act and the invoice for accounting.
Yes, we deliver and install the shelving with our own crew: we level it, anchor tall sections to the wall and adjust the supports. In a shopping center we come at night or on a day off per the mall regulations, so the store runs as usual.
The most affordable line in the price list on this page is home shelving made of laminated chipboard or MDF. The final price depends on height, number of shelves and the frame; we fix the exact amount in the contract after a free measurement.
Yes, we build LED strip in an aluminum profile into retail and home shelving under each shelf or along the vertical uprights. The wire is hidden in the frame, and the power supply goes in the bottom section.
We give a 24-month warranty on shelving under the contract: if a shelf sags, an edge comes off or the frame loosens, we come and fix it. Blum hinges and runners in closed sections carry the manufacturer's 25-year warranty.
Yes, we deliver with our own vehicle: within Almaty and up to 30 km delivery is free for a large order, beyond that — for an extra charge. The free delivery threshold is stated on the Delivery and payment page.
10Reviews
4,9
average rating
on Google and Zoon
Everyone can see a review on the platform: this is how other people check whom to trust with an order. If something went wrong, write to us and we will reply within 1–2 business days.
Message us on WhatsApp11Article
We make custom shelving to fit the room dimensions and the weight of what will go on the shelves: retail, warehouse, niche and partition units. Measurement and a 3D design take 1–2 days and are free, the frame and shelves are made in our own 600 m² workshop, we install with our own team and give a 24-month warranty under the contract.
Sagging is the most common complaint about ready-made shelving. It is built in at the drawing stage, when the span and material are chosen from a catalog rather than by the weight of the load.
Shelf sag depends most on the span between supports and only then on board thickness. A long laminated chipboard shelf under boxes or books eventually bows, even if it sits straight for the first few weeks: the board slowly gives way to constant load. A short span almost eliminates the problem, so for heavy goods the uprights are placed closer together rather than simply choosing a thicker board. The second factor is how the load sits: concentrated weight in the middle is more dangerous than weight spread evenly along the length. The third is the shelf edge: an open end without edge banding absorbs moisture during cleaning, and the board loses rigidity. That is why we first ask what will stand on the tiers, and only then choose the section size based on that answer. This approach is familiar to anyone who has ever ordered custom furniture: shelving, wardrobes and wall-mounted systems last longer when the designer knows the real weight of the load.
| Shelf material | Load | Where it fits |
|---|---|---|
| Laminated chipboard 16 mm | light | decor, cosmetics, folded clothes |
| Laminated chipboard 18 mm | medium | books, shoes, folders, dishes |
| Plywood on a metal frame | high | boxes in the back room |
| Steel shelf | high | tools, stock, heavy crates |
| Solid wood | medium | open shelves in the living room and showroom |
At the control assembly in the workshop we load the tiers and check whether sag has appeared or the shelf supports have shifted. This check is part of our quality control standard, along with inspection of edge banding and welded frame joints. If a board performs worse than calculated, it is replaced with a thicker one or an intermediate upright is added right in the workshop, before the structure goes to the customer. Fixing a structure on the workbench is faster and cheaper than disassembling a loaded section in a shop or back room. After testing we label the sections so the team assembles them on site in the same order. The finished item carries a 24-month warranty under the contract, and sagging within that period is a warranty case. The load report stays with the technologist, and for repeat orders new sections are calculated from the same initial data.
The purpose of the room determines the frame, the shelf material and how much appearance matters. The same wall width in a shop, back room and living room calls for different solutions.
For the sales floor, we most often make wall-mounted shelving on a metal frame with laminated chipboard shelves and island sections between them. The wall section holds the main display and can rise almost to the ceiling. The island section stands in the center of the hall and is visible from all sides, so its ends are finished with price holders, a mirror or lighting. For footwear, slanted tiers work well; for small items, pull-out drawers in the lower tier. When a custom retail shelving unit is designed together with the hall layout, aisles and cash desk visibility are convenient from day one. We match the laminated chipboard decor to the store interior, and powder-coat the frame in any color so the shelving and counter look like one set. The top tier is often used for boxed stock, and the bottom is closed with a plinth that takes hits from the cleaner's cart.
| Frame | Strength | Where it fits |
|---|---|---|
| Laminated chipboard carcass | color and decor to match the interior | sales floor, home, niche |
| Metal frame with laminated chipboard shelves | durability and a light look | store, showroom, archive |
| Steel frame with plywood | high load capacity | warehouse, back room |
| Metal with solid wood | wood texture | loft store, coffee shop, living room |
Accurate initial data saves time on approval and prevents rework. You can start with a few numbers and photos; the rest is clarified during measurement.
| Stored item | Shelf depth | What to consider |
|---|---|---|
| Books and folders | shallow | extra depth collects dust |
| Shoes | medium | an angled shelf saves space |
| Folded clothes | medium | the height of the stack sets the shelf spacing |
| Boxes in the storage room | to match the box size | clearance for a trolley |
| Dishes and decor | shallow | lighting highlights the items |
We measure a niche at several points along the height and width, because walls and ceilings in apartments and retail spaces are rarely perfectly even. A difference of even a couple of centimetres between the bottom and top of an opening is immediately visible if the section is built to a single figure. In the drawing, such a difference is closed with a filler strip rather than left as a gap that small items later fall into. We prepare the measurement and 3D design free of charge within 1–2 days, so the customer sees the shelving unit in their own space before it goes into production. On the design we mark sockets, switches and pipes straight away so the tiers don't cover them. If the shelving unit is built into a niche up to the ceiling, the upper part is made as a separate module — that makes the structure easier to bring through a doorway and carry up the stairs. The measurement specialist records all the marks in the drawing, and the workshop works from them.
A tall loaded structure must stand firmly, especially where customers, children or staff with trolleys pass by. Stability comes from the fixing, the supports and the order of loading.
A shelving unit is fixed to the wall when its height is much greater than its depth: a narrow tall section tips easily if you pull on the top shelf or lean on it. Anchoring to a load-bearing or brick wall removes this risk, and for drywall a special fixing or a backing in the partition frame is chosen. Freestanding structures with no wall behind them are made wider at the base and with a heavy bottom tier. The order of loading matters too: heavy boxes and crates go at the bottom, light items and decor on top. If the tiers are expected to be overloaded often, the bottom tier is best closed with a plinth: it takes the knocks from trolleys and the vacuum cleaner. These rules work the same way in a shop, in a storage room and in a child's room. The fixings are chosen according to the wall material at the measurement stage, so the team brings the right anchors straight away.
We fit adjustable supports so the structure doesn't wobble on an uneven floor and the joints between neighbouring sections stay level. Floors in shopping centres, old buildings and warehouses often have a slope or a difference between tiles, and a rigid plinth on such a floor ends up with a gap. A threaded support lets each section be levelled during installation and tightened later if the section has been moved. For island shelving units the supports are especially important: they have no wall to absorb the rocking. In a storage room, plates are placed under the supports so the feet don't press into the floor covering. The team checks the level after loading the first tiers, because the structure may settle slightly under weight. If the floor is noticeably uneven, we build supports with a longer thread travel into the design in advance, so there's no need to slip cardboard under the feet.
The item goes through several stages in the workshop, and each one determines part of its future strength. Below is what happens to the shelves and the frame, and what the final estimate depends on.
We cut the shelves and side panels from 16–18 mm Egger and Kronospan laminated chipboard on a machine according to the drawing, so the dimensions match the project to the millimetre. Then we seal the edges with 2 mm PVC edge banding on an edgebander: the edge protects the board from moisture during washing and from knocks by boxes. Shelving is made in our own 600 m² workshop in Almaty, not by a subcontractor, and the technician sees every part before assembly. The holes for the shelf supports are drilled using a template so that the board sits evenly in any position. Finished parts are sorted by section, and at the test assembly we check that everything fits without rework. We have been working for 13 years, and this procedure is the same for a home section in a niche and for fitting out an entire sales floor. The drawing and cutting plan are kept in the workshop archive in case of a repeat order.
We weld the uprights and frames from steel profile tube, clean the seams and apply powder coating in our workshop's booth. Powder coating is denser than ordinary paint: it does not wear off from constant touching, and it withstands wet cleaning and a damp stockroom. The frame colour is matched to the store interior — matte black, white, graphite or another shade from the palette. Making shelving with a metal frame in the same workshop as the shelves is convenient because the holes, fasteners and dimensions are coordinated at the drawing stage. Before dispatch, the frame is assembled together with the tiers and tested with a load, and the welded joints are inspected by the technician. This way the sections fit into place on site without trimming or extra fasteners. We keep leftover paint of the same shade so that a scratch can be touched up after the store moves.
A good storage system can be reconfigured, extended and lit without replacing the entire structure. It is worth thinking about this in advance, at the project stage.
A through shelving unit divides a studio apartment, showroom or office into zones while still letting daylight in from the window. The shelves are accessible from both sides, so one side can serve as a living area and the other as a work or sleeping zone. If partial privacy is needed, some of the cells are closed off with a back panel or cabinets with doors, while the rest are left open. The partition must be fixed to the floor and ceiling or to the wall, because a heavy upper section without support will sway. Heavy items go in the lower sections, while light decor and plants go on top. Wooden partitions made of solid wood are a separate topic with their own species and care; on a metal frame with laminated chipboard shelves, the structure comes out lighter and more austere. Cell heights are set for specific items so the partition looks filled rather than empty.
You can save on the finish and the number of sections, but not on the frame or the shelf span. A solid-colour laminated chipboard decor is usually more affordable than enamel and veneer, open shelves are simpler than cabinets with doors, and a standard powder-coating colour saves you from a separate paint order. If you want custom shelving cheaply, start with the basic modules: we keep the drawings and decor on file, so six months later you can order an extra section in the same size and colour. For a chain of stores, identical modules work out cheaper because one estimate and one contract cover all the locations. It is not worth saving on the board thickness or the number of uprights: a sagging tier will cost more than an extra support in the drawing. Lead times and prices for each option are in the price list on this page, and the manager sends an estimate with your chosen options after the measurement.
Reliable shelving starts not with the colour of the shelves, but with the question of what will stand on them and where the unit will go. The rest of the decisions follow from that answer.
12Calculation
Choose the type of shelving, the number of identical sections, the shelf material and hardware — the calculation will go to a manager on WhatsApp, who will check the dimensions and send you a quote.
13Retail furniture