Almaty Daily 10:00–20:00 +7 705 625 00 03 Book via WhatsApp
A wall-mounted shelving unit with square cells displaying dishes and textiles in a bright store

For business · Retail

Custom shelving in Almaty

We make shelving for your goods, warehouse or niche: shelf spacing, depth and frame are calculated from the weight and dimensions of what will go on them. Measurement and 3D design are free, the price is fixed in the contract before we start, warranty 24 months.

Measurement and 3D design are free and carry no obligation · price fixed in the contract · Kaspi Instalments up to 24 months

★ 4,9
Google rating
from 5 days
lead time
24 mo.
warranty under contract

Wall-mounted wooden shelving with cells for displaying goods in a store

02Projects

Completed shelving projects

Scope, materials and lead time — for each project.

  • A shelving partition in a studio — MEBLIX project, Esentai City residential complex, Bostandyk districtStore

    Partition shelving in a studio

    Esentai City residential complex, Bostandyk district

    Partition shelving separated the bedroom from the living room in a studio: open sections let light through, closed drawers below. One side was made as an open display for books, the reverse — a closed front in the wall color.

    Scope
    bedroom / living room partition
    Materials
    Laminated chipboard, solid wood
    Lead time
    12 days
    I want the same
  • Island retail shelving — MEBLIX project, MEGA Alma-Ata shopping center, Auezov districtStore

    Island retail shelving

    MEGA Alma-Ata shopping center, Auezov district

    Island shelving for high foot traffic in the center of the hall: goods displayed on both sides, adjustable shelves for changing collections and price holders. Quickly rearranged for a new display without a specialist.

    Scope
    island sections in the center of the hall
    Materials
    Laminated chipboard, metal
    Lead time
    10 days
    I want the same
  • Archive shelving in an office — MEBLIX project, Nurly Tau business center, Bostandyk districtStore

    Archive shelving for the office

    Nurly Tau business center, Bostandyk district

    A wall of open shelving for archive folders and accounting boxes. The span was shortened for the weight of paper, shelves at a 32 mm pitch for folder format, built into the corridor niche without losing floor space.

    Scope
    wall of shelving for documents
    Materials
    Laminated chipboard
    Lead time
    10 days
    I want the same
  • A home library shelving unit — MEBLIX project, Miras microdistrict, Bostandyk districtStore

    Home library shelving

    Miras microdistrict, Bostandyk district

    A full-wall library in the study made of solid oak: the span was shortened for books and a thicker board used so the shelves don't sag under the weight. The height was fitted to the ceiling, the top rows — for a step ladder.

    Scope
    full-wall shelving for books
    Materials
    solid oak
    Lead time
    16 days
    I want the same
  • Shelving for cosmetics — MEBLIX project, Dostyk Plaza shopping center, Medeu districtStore

    Shelving for cosmetics

    Dostyk Plaza shopping center, Medeu district

    A cosmetics island: narrow shelves at eye level, glass inserts and high-color-rendering LED lighting. Adjustable shelves let you change the display for the season and new arrivals.

    Scope
    island with narrow shelves
    Materials
    Laminated chipboard, glass, LED
    Lead time
    9 days
    I want the same
  • A wooden shelving unit — MEBLIX project, Gorny Gigant microdistrict, Medeu districtStore

    Wooden shelving

    Gorny Gigant microdistrict, Medeu district

    Solid beech shelving for the living room for decor, books and electronics. Long open shelves for decor, closed sections below for storage. Every edge is on show, finished with oil-wax to bring out the wood grain.

    Scope
    living room shelving
    Materials
    solid beech
    Lead time
    18 days
    I want the same

03How we work with stores

How ordering a shelving unit works

Book a measurement specialist for the store
  1. 01

    5 minutes

    Consultation

    Message us on WhatsApp or call. We discuss the task, style and budget, show similar projects and give a price estimate.

  2. 02

    within 24 hours

    Measurement

    The measurer comes free of charge anywhere in Almaty, takes laser measurements accurate to 1 mm, and marks sockets, pipes and uneven walls. Brings samples.

  3. 03

    1–2 days

    3D design and estimate

    We show the furniture in its colours and materials and make changes free of charge until you approve. Price, lead time and installation date are fixed in the contract.

  4. 04

    from 5 days

    Production

    In the workshop we cut the shelves and sides, edge the ends, weld and paint the metal frame, then assemble the shelving and test the shelves under load. Lead time for each type is in the price list above.

  5. 05

    1 day

    Delivery and installation

    We deliver, bring in, assemble, set up and adjust the furniture. After installation we clean up.

  6. 06

    24 months

    Sign-off and warranty

    You check every mechanism, sign the certificate and pay the balance. The warranty starts that day, with service response within 1–2 business days.

04Prices

Prices for custom shelving

The "from" price is for a shelving unit of base size; the total depends on height, number of shelves, frame and material. The exact estimate is fixed in the contract after a free measurement, and it doesn't change during the work.

  • 50% prepayment, the rest after installation and sign-off
  • Kaspi, card, cash, bank transfer for companies
  • 1–2 days for a 3D design, revisions free
  • Kaspi Instalments over 3–24 months with no down payment
Get an exact quote
ItemMaterialLead timePrice
  • Shelving for homeLaminated chipboard, MDF5 daysfrom 14 000 ₸
  • Shelving for a nicheMoisture-resistant laminated chipboard6 daysfrom 18 000 ₸
  • Retail shelvingLaminated chipboard, metal frame7 daysfrom 22 000 ₸
  • Metal warehouse shelvingMetal, plywood10 daysfrom 28 000 ₸
  • Shelving dividerLaminated chipboard, solid wood12 daysfrom 40 000 ₸
  • Combined (metal + wood)Metal frame, solid wood14 daysfrom 45 000 ₸
  • Wooden shelving for the bathroom (moisture-resistant plywood)Moisture-resistant plywood, lacquer7–10 daysfrom 48 000 ₸
  • Compact metal warehouse shelving (5 shelves)Steel7–10 daysfrom 52 000 ₸
  • Prefabricated metal warehouse shelving with perforated shelvesPowder-coated steel7–10 daysfrom 65 000 ₸
  • Partition shelving on a metal frame with laminated chipboard shelvesMetal, laminated chipboard7–10 daysfrom 78 000 ₸
  • Heavy-duty metal warehouse shelving (4 shelves)Galvanized steel7–10 daysfrom 95 000 ₸
  • Island retail shelving with slanted shelves (footwear)Metal, MDF7–10 daysfrom 120 000 ₸
  • Openwork partition shelving made of solid pine (4 sections)Pine solid wood7–10 daysfrom 135 000 ₸
  • Island retail shelving with drawersLaminated chipboard, metal runners7–10 daysfrom 150 000 ₸
  • Open wooden shelving made of solid oak for the living roomSolid oak7–10 daysfrom 185 000 ₸

05For legal entities

We supply shelving units to businesses with contract and invoice

We work with LLPs and sole proprietors on bank transfer. Price, materials and lead times — in the contract before production starts.

Request a contract and invoice
  1. 01Contractprice, materials, lead time and installation date — before we start
  2. 02Estimate and 3D designfree, within 1–2 days after measuring the hall
  3. 03Invoice for paymentbank transfer for LLPs and sole traders
  4. 04Closing documentsacceptance certificate and delivery note after installation
50%
deposit, balance — after the acceptance certificate
Bank transfer
for LLPs and sole proprietors; for private clients — card and cash
24 mo.
warranty on items per the contract
Store chain
from a single shelving unit to a chain of locations in one style — one estimate and one contract
Installation in a shopping center
at night or on weekends — per the shopping center's rules
Repeat order
the same modules for a new location later

06Principles

Why a custom shelving unit holds its load for years

  1. 01

    We calculate shelf span from the weight

    The heavier the goods, the shorter the span between uprights: for boxes in the stockroom and for books at home the support spacing comes out different, and the shelf doesn't sag.

  2. 02

    We anchor to the wall or stand on supports

    We anchor tall shelving to the wall, and a freestanding unit stands on adjustable supports — it doesn't wobble on an uneven floor in the hall or warehouse.

  3. 03

    Shelves are rearranged without tools

    The hole pitch in the uprights lets you raise or lower a shelf in a minute when the goods, boxes or book height change.

  4. 04

    Depth for the real item

    We take shelf depth from the size of boxes, footwear or folders, not from a catalog: the shelving doesn't eat up extra aisle space in the hall and corridor.

  5. 05

    Ends are finished with PVC edge banding

    We edge the open ends of the shelves with 2 mm PVC in our own workshop: the board doesn't absorb moisture when washed and doesn't crumble from box impacts.

  6. 06

    Modules for reordering

    We keep the drawings and decor, so a year later you can add a section of the same size for a new wall, outlet or warehouse.

A stack of Egger and Kronospan laminated chipboard sheets in our workshop warehouse before cutting for retail furnitureA CNC machine cuts the laminated chipboard sheet into parts for shelving and counters according to the drawingsAn edge banding machine seals the ends of the shelves with PVC edge banding in the MEBLIX workshop in AlmatyA craftsman applies enamel to the MDF checkout counter fronts in the spray booth of our workshopA craftsman checks the control assembly of retail equipment in the workshop before sending it to the storeFinished wall-mounted shelving with shelf lighting in a cosmetics store after installation

01 / 06

07Production

How a shelving unit goes through our workshop

Six steps in our 600 m² workshop. You can see each of them with your own eyes: the showroom and production are under one roof.

  1. A stack of Egger and Kronospan laminated chipboard sheets in our workshop warehouse before cutting for retail furniture
    01

    Egger · Kronospan · E1

    Board

    Egger and Kronospan boards of emission class E1 arrive at the workshop warehouse. 40+ laminated chipboard decors, thickness 16–18 mm. Class E1 — for sales floors and display windows.

  2. A CNC machine cuts the laminated chipboard sheet into parts for shelving and counters according to the drawings
    02

    Laser measuring to 1 mm

    CNC cutting

    A design engineer prepares the drawings, and the machine cuts the board to them. Dimensions come from a laser measurement accurate to 1 mm.

  3. An edge banding machine seals the ends of the shelves with PVC edge banding in the MEBLIX workshop in Almaty
    03

    Blum · Hettich · Boyard

    Edging and drilling

    The edge-banding machine seals the edges, then we drill holes for Blum hinges and Hettich runners.

  4. A craftsman applies enamel to the MDF checkout counter fronts in the spray booth of our workshop
    04

    Any RAL colour

    Enamel and veneer

    A finishing specialist paints fronts to RAL — matte and gloss. We weld the uprights of metal shelving from square tubing and powder-coat them in the workshop, so the frame doesn't rust in a damp back room.

  5. A craftsman checks the control assembly of retail equipment in the workshop before sending it to the store
    05

    Pre-assembly in the workshop

    Assembly and inspection

    We assemble the modules in the workshop before dispatch, checking front gaps and drawer travel. The quality control department signs the item off for shipping.

  6. Finished wall-mounted shelving with shelf lighting in a cosmetics store after installation
    06

    Night installation per mall regulations

    Finished item

    We deliver, bring in, assemble in 1 day, adjust the furniture and clean up after ourselves. From signing the acceptance act — 24-month warranty.

08Team

The craftsmen behind shelving units

MEBLIX workshop craftsmen who make and assemble furniture to order.

01 / 07
Aidyn Bolenov, Cabinet furniture repair craftsman

Aidyn Bolenov

Cabinet furniture repair craftsman20 years

★ 4.99 · 73 ratings

Aleksandr Martynenko, Furniture and kitchen unit assembler

Aleksandr Martynenko

Furniture and kitchen unit assembler23 years

★ 4.97 · 300 ratings

Andrei D., Made-to-order furniture maker

Andrei D.

Made-to-order furniture maker7 years

★ 4.26 · 32 ratings

Akzholtai U., Furniture maker

Akzholtai U.

Furniture maker5 years

★ 4.23 · 30 ratings

Vasilii Krasnov, Joiner and carpenter

Vasilii Krasnov

Joiner and carpenter20 years

★ 5.0 · 113 ratings

Viktor Gurov, Furniture front and hardware fitter

Viktor Gurov

Furniture front and hardware fitter17 years

★ 4.61 · 92 ratings

09FAQ

Frequently asked questions about custom shelving

Didn’t find the answer? Message us — a manager replies, not a bot.

Ask on WhatsApp
01How much weight can a shelf of custom shelving hold?

We build the load into the project in advance: we ask what will stand on the shelves and choose the board thickness, span between uprights and frame accordingly. For heavy boxes in the back room we use a metal frame and a short span; for books and decor at home, 18 mm laminated chipboard is enough.

02Can you make shelving for a non-standard niche or a sloped ceiling?

Yes, we make shelving for a niche by measuring the opening at several points, so crooked walls and height differences are accounted for in the drawing. We follow a sloped ceiling with the top shelf or a box, and no gaps remain between the shelving and the wall.

03When will my shelving be ready?

The lead time depends on the type and material, and for each option it is stated in the price list on this page. If you have a hard date for a store opening or a move, tell the manager — a rush order is possible.

04Is metal or laminated chipboard better for warehouse shelving?

For boxes and stock, a metal frame with plywood or steel shelves is more reliable: it holds more weight and isn't afraid of a damp back room. Laminated chipboard shelving is suitable for a sales floor and at home, where the look and color of the shelves matter.

05How do I place an order for shelving for a LLP or sole proprietor with closing documents?

Yes: we sign a contract, issue an invoice, and the company pays by bank transfer in two stages — half before the workshop starts, half after the acceptance act. After installation we hand over the act and the invoice for accounting.

06Do you install the shelving yourselves and anchor it to the wall?

Yes, we deliver and install the shelving with our own crew: we level it, anchor tall sections to the wall and adjust the supports. In a shopping center we come at night or on a day off per the mall regulations, so the store runs as usual.

07How much does the simplest custom shelving cost?

The most affordable line in the price list on this page is home shelving made of laminated chipboard or MDF. The final price depends on height, number of shelves and the frame; we fix the exact amount in the contract after a free measurement.

08Can I add shelf lighting to the shelving?

Yes, we build LED strip in an aluminum profile into retail and home shelving under each shelf or along the vertical uprights. The wire is hidden in the frame, and the power supply goes in the bottom section.

09What warranty comes with the shelving and what does it cover?

We give a 24-month warranty on shelving under the contract: if a shelf sags, an edge comes off or the frame loosens, we come and fix it. Blum hinges and runners in closed sections carry the manufacturer's 25-year warranty.

10Will you deliver shelving to a warehouse outside the city?

Yes, we deliver with our own vehicle: within Almaty and up to 30 km delivery is free for a large order, beyond that — for an extra charge. The free delivery threshold is stated on the Delivery and payment page.

10Reviews

Reviews of MEBLIX shelving

4,9

average rating
on Google and Zoon

See all reviews

11Article

Custom shelving in Almaty for shops, warehouses and homes

Temirzhan Nurpeisov, Furniture assembly carpenter
Author
Temirzhan NurpeisovFurniture assembly carpenter
Published
Updated

We make custom shelving to fit the room dimensions and the weight of what will go on the shelves: retail, warehouse, niche and partition units. Measurement and a 3D design take 1–2 days and are free, the frame and shelves are made in our own 600 m² workshop, we install with our own team and give a 24-month warranty under the contract.

Why shelves sag and how to avoid it

Sagging is the most common complaint about ready-made shelving. It is built in at the drawing stage, when the span and material are chosen from a catalog rather than by the weight of the load.

What shelf sag depends on

Shelf sag depends most on the span between supports and only then on board thickness. A long laminated chipboard shelf under boxes or books eventually bows, even if it sits straight for the first few weeks: the board slowly gives way to constant load. A short span almost eliminates the problem, so for heavy goods the uprights are placed closer together rather than simply choosing a thicker board. The second factor is how the load sits: concentrated weight in the middle is more dangerous than weight spread evenly along the length. The third is the shelf edge: an open end without edge banding absorbs moisture during cleaning, and the board loses rigidity. That is why we first ask what will stand on the tiers, and only then choose the section size based on that answer. This approach is familiar to anyone who has ever ordered custom furniture: shelving, wardrobes and wall-mounted systems last longer when the designer knows the real weight of the load.

Which shelf material for which load

Shelf material and permissible load weight
Shelf materialLoadWhere it fits
Laminated chipboard 16 mmlightdecor, cosmetics, folded clothes
Laminated chipboard 18 mmmediumbooks, shoes, folders, dishes
Plywood on a metal framehighboxes in the back room
Steel shelfhightools, stock, heavy crates
Solid woodmediumopen shelves in the living room and showroom

How we test shelves before dispatch

At the control assembly in the workshop we load the tiers and check whether sag has appeared or the shelf supports have shifted. This check is part of our quality control standard, along with inspection of edge banding and welded frame joints. If a board performs worse than calculated, it is replaced with a thicker one or an intermediate upright is added right in the workshop, before the structure goes to the customer. Fixing a structure on the workbench is faster and cheaper than disassembling a loaded section in a shop or back room. After testing we label the sections so the team assembles them on site in the same order. The finished item carries a 24-month warranty under the contract, and sagging within that period is a warranty case. The load report stays with the technologist, and for repeat orders new sections are calculated from the same initial data.

Which custom shelving to choose for a sales floor, warehouse and home

The purpose of the room determines the frame, the shelf material and how much appearance matters. The same wall width in a shop, back room and living room calls for different solutions.

What goes on the sales floor

For the sales floor, we most often make wall-mounted shelving on a metal frame with laminated chipboard shelves and island sections between them. The wall section holds the main display and can rise almost to the ceiling. The island section stands in the center of the hall and is visible from all sides, so its ends are finished with price holders, a mirror or lighting. For footwear, slanted tiers work well; for small items, pull-out drawers in the lower tier. When a custom retail shelving unit is designed together with the hall layout, aisles and cash desk visibility are convenient from day one. We match the laminated chipboard decor to the store interior, and powder-coat the frame in any color so the shelving and counter look like one set. The top tier is often used for boxed stock, and the bottom is closed with a plinth that takes hits from the cleaner's cart.

What the warehouse and back room need

  • Frame strength: warehouse shelving is assembled on steel posts because boxes of goods weigh more than any display on the sales floor.
  • Plywood or steel shelves: withstand crates and are not afraid of the damp back room, which is rarely as dry as the sales floor.
  • Perforated posts: allow moving a tier to fit a box of a different height without tools and without disassembling the whole section.
  • Aisle width: the aisle between rows is calculated based on the width of a cart or a loader with a box, otherwise stock has to be moved by hand.
  • Tier marking: numbering the cells speeds up finding goods when the warehouse is served by several employees on different shifts.

How shelving frames differ

Frame types and their purpose
FrameStrengthWhere it fits
Laminated chipboard carcasscolor and decor to match the interiorsales floor, home, niche
Metal frame with laminated chipboard shelvesdurability and a light lookstore, showroom, archive
Steel frame with plywoodhigh load capacitywarehouse, back room
Metal with solid woodwood textureloft store, coffee shop, living room

What dimensions are needed for an accurate quote

Accurate initial data saves time on approval and prevents rework. You can start with a few numbers and photos; the rest is clarified during measurement.

What to send the manager before measurement

  • Photo of the wall or opening: the photo shows sockets, radiators, windowsill and doors that the structure must work around.
  • Three dimensions: wall width, height to ceiling and allowable depth — this is enough for us to order a made-to-measure shelving unit and get a first estimate.
  • List of items for the shelves: boxes, footwear, books or dishes — this determines tier spacing, thickness and frame choice.
  • Room features: sloped ceiling, uneven floor, damp back room or a customer aisle that cannot be narrowed.
  • Desired look: shelf color, open or closed sections and whether lighting is needed — the manager will include this in the quote right away.

What shelf depth is needed for different items

Shelf depth for different loads
Stored itemShelf depthWhat to consider
Books and foldersshallowextra depth collects dust
Shoesmediuman angled shelf saves space
Folded clothesmediumthe height of the stack sets the shelf spacing
Boxes in the storage roomto match the box sizeclearance for a trolley
Dishes and decorshallowlighting highlights the items

How we measure a niche and uneven walls

We measure a niche at several points along the height and width, because walls and ceilings in apartments and retail spaces are rarely perfectly even. A difference of even a couple of centimetres between the bottom and top of an opening is immediately visible if the section is built to a single figure. In the drawing, such a difference is closed with a filler strip rather than left as a gap that small items later fall into. We prepare the measurement and 3D design free of charge within 1–2 days, so the customer sees the shelving unit in their own space before it goes into production. On the design we mark sockets, switches and pipes straight away so the tiers don't cover them. If the shelving unit is built into a niche up to the ceiling, the upper part is made as a separate module — that makes the structure easier to bring through a doorway and carry up the stairs. The measurement specialist records all the marks in the drawing, and the workshop works from them.

How to make a tall shelving unit stable

A tall loaded structure must stand firmly, especially where customers, children or staff with trolleys pass by. Stability comes from the fixing, the supports and the order of loading.

When a shelving unit must be fixed to the wall

A shelving unit is fixed to the wall when its height is much greater than its depth: a narrow tall section tips easily if you pull on the top shelf or lean on it. Anchoring to a load-bearing or brick wall removes this risk, and for drywall a special fixing or a backing in the partition frame is chosen. Freestanding structures with no wall behind them are made wider at the base and with a heavy bottom tier. The order of loading matters too: heavy boxes and crates go at the bottom, light items and decor on top. If the tiers are expected to be overloaded often, the bottom tier is best closed with a plinth: it takes the knocks from trolleys and the vacuum cleaner. These rules work the same way in a shop, in a storage room and in a child's room. The fixings are chosen according to the wall material at the measurement stage, so the team brings the right anchors straight away.

Why adjustable supports are needed

We fit adjustable supports so the structure doesn't wobble on an uneven floor and the joints between neighbouring sections stay level. Floors in shopping centres, old buildings and warehouses often have a slope or a difference between tiles, and a rigid plinth on such a floor ends up with a gap. A threaded support lets each section be levelled during installation and tightened later if the section has been moved. For island shelving units the supports are especially important: they have no wall to absorb the rocking. In a storage room, plates are placed under the supports so the feet don't press into the floor covering. The team checks the level after loading the first tiers, because the structure may settle slightly under weight. If the floor is noticeably uneven, we build supports with a longer thread travel into the design in advance, so there's no need to slip cardboard under the feet.

How installation works in a shop and at home

  • Delivery: we bring the sections in our own vehicle disassembled and marked after a test assembly in the workshop.
  • Assembly according to the drawing: the team assembles custom shelving in the same order as in the workshop, with no on-site fitting.
  • Levelling: we adjust the supports and check the vertical and the joints between adjacent sections with a laser level.
  • Wall fixing: we anchor tall sections, check the shelf supports and tighten the frame connections.
  • Installation in shopping malls: in shopping centres we work at night or at weekends according to the centre's rules so that the store does not close.

How custom shelving is made

The item goes through several stages in the workshop, and each one determines part of its future strength. Below is what happens to the shelves and the frame, and what the final estimate depends on.

What happens to the shelves in the workshop

We cut the shelves and side panels from 16–18 mm Egger and Kronospan laminated chipboard on a machine according to the drawing, so the dimensions match the project to the millimetre. Then we seal the edges with 2 mm PVC edge banding on an edgebander: the edge protects the board from moisture during washing and from knocks by boxes. Shelving is made in our own 600 m² workshop in Almaty, not by a subcontractor, and the technician sees every part before assembly. The holes for the shelf supports are drilled using a template so that the board sits evenly in any position. Finished parts are sorted by section, and at the test assembly we check that everything fits without rework. We have been working for 13 years, and this procedure is the same for a home section in a niche and for fitting out an entire sales floor. The drawing and cutting plan are kept in the workshop archive in case of a repeat order.

How we prepare the metal frame

We weld the uprights and frames from steel profile tube, clean the seams and apply powder coating in our workshop's booth. Powder coating is denser than ordinary paint: it does not wear off from constant touching, and it withstands wet cleaning and a damp stockroom. The frame colour is matched to the store interior — matte black, white, graphite or another shade from the palette. Making shelving with a metal frame in the same workshop as the shelves is convenient because the holes, fasteners and dimensions are coordinated at the drawing stage. Before dispatch, the frame is assembled together with the tiers and tested with a load, and the welded joints are inspected by the technician. This way the sections fit into place on site without trimming or extra fasteners. We keep leftover paint of the same shade so that a scratch can be touched up after the store moves.

What the lead time and price depend on

  • Type of shelving: a warehouse frame, wall-mounted retail, island or partition requires a different amount of work in the workshop.
  • Material of the shelves and frame: laminated chipboard, plywood, steel or solid wood affect the lead time and cost in different ways.
  • Size and number of sections: a tall floor-to-ceiling shelving unit made of several modules takes longer to cut, assemble and install.
  • Options: lighting, drawers, slanted shelves, a plinth and painting the frame in a non-standard colour add production stages.
  • Where to see the figures: the lead times and prices for each option are given in the price list on this page, and we fix the final amount in the contract.

How shelving changes together with your space

A good storage system can be reconfigured, extended and lit without replacing the entire structure. It is worth thinking about this in advance, at the project stage.

How shelving as a partition divides space

A through shelving unit divides a studio apartment, showroom or office into zones while still letting daylight in from the window. The shelves are accessible from both sides, so one side can serve as a living area and the other as a work or sleeping zone. If partial privacy is needed, some of the cells are closed off with a back panel or cabinets with doors, while the rest are left open. The partition must be fixed to the floor and ceiling or to the wall, because a heavy upper section without support will sway. Heavy items go in the lower sections, while light decor and plants go on top. Wooden partitions made of solid wood are a separate topic with their own species and care; on a metal frame with laminated chipboard shelves, the structure comes out lighter and more austere. Cell heights are set for specific items so the partition looks filled rather than empty.

What options can be added to shelving

  • Shelf lighting: we install LED strip in an aluminium profile under the tier or along the uprights, with the wire hidden in the frame.
  • Pull-out drawers: in the lower tier they conceal small items and stock; we select the runners for the weight of the contents.
  • Angled shelves: needed for shoes, magazines and packaging so the customer can see the product in full from the aisle.
  • Plinth and supports: the plinth protects the bottom from knocks and dust, adjustable supports level the shelving on an uneven floor.
  • Price-tag holders and dividers: plastic strips on the shelf edge and dividers help keep the display neat.

How to save money without losing strength

You can save on the finish and the number of sections, but not on the frame or the shelf span. A solid-colour laminated chipboard decor is usually more affordable than enamel and veneer, open shelves are simpler than cabinets with doors, and a standard powder-coating colour saves you from a separate paint order. If you want custom shelving cheaply, start with the basic modules: we keep the drawings and decor on file, so six months later you can order an extra section in the same size and colour. For a chain of stores, identical modules work out cheaper because one estimate and one contract cover all the locations. It is not worth saving on the board thickness or the number of uprights: a sagging tier will cost more than an extra support in the drawing. Lead times and prices for each option are in the price list on this page, and the manager sends an estimate with your chosen options after the measurement.

The bottom line on shelving units

Reliable shelving starts not with the colour of the shelves, but with the question of what will stand on them and where the unit will go. The rest of the decisions follow from that answer.

  • Span matters more than thickness: for heavy loads the uprights are placed closer together, so the shelf does not sag even after several years.
  • Frame to suit the purpose: a warehouse needs steel and plywood, while a showroom and a home need laminated chipboard, a metal frame or solid wood to match the interior.
  • Sizes from the measurement: photos and three figures give a first estimate, while the precise drawing is built from a measurement taken at several points.
  • Stability is essential: tall sections are fixed to the wall, island units stand on adjustable supports and are loaded from the bottom.
  • Room for the future: saved drawings and identical modules let you add sections, lighting and drawers later.

12Calculation

How to calculate shelving to your dimensions

Choose the type of shelving, the number of identical sections, the shelf material and hardware — the calculation will go to a manager on WhatsApp, who will check the dimensions and send you a quote.

01Type
02Quantity, pcs of identical items
1 pc
130 pcs
03Carcass
04Fronts
05Hardware
06Options

13Retail furniture

What else we make besides shelving units