Almaty Daily 10:00–20:00 +7 705 625 00 03 Book via WhatsApp
Installation
into a floor-to-ceiling niche
Boxes
E1 laminated chipboard
Price
from 250 000 ₸
In the price list
15 items

Custom built-in furniture in Almaty

We design and build made-to-measure furniture to fit a niche, ceiling and appliances — with a test assembly in our own workshop. Measurement and 3D design are free, the price is fixed in the contract, and the item comes with a 24-month warranty.

Measurement and 3D design are free and carry no obligation · price fixed in the contract · Kaspi Instalments up to 24 months

★ 4,9
Google rating
from 7 days
minimum lead time in the price list
24 mo.
warranty under contract

02Features

Benefits of niche furniture for an apartment

  1. 01

    Carcass strength

    Laminated chipboard and MDF handle the load of shelves and rails; for heavy sections we reinforce the fixings and use metal runners.

  2. 02

    Texture and colour

    Egger and Kronospan boards offer a wide choice of décors — from solid colours to wood textures, so the furniture fits into the interior.

  3. 03

    Behaviour in humidity

    Built-in furniture in the kitchen and hallway is exposed to steam and temperature changes; edge banding protects the board ends from swelling.

  4. 04

    Repairability of sections

    The carcass is assembled with confirmats and cam locks, the shelves are removable, the supports are adjustable — a section can be replaced without dismantling the whole wardrobe.

  5. 05

    Eco-friendliness of materials

    Egger and Kronospan boards meet emission class E1, have no smell and are therefore suitable for furniture in a child's room and bedroom.

  6. 06

    Using the room's geometry

    The niche, sloped wall and ceiling height define the shape of the carcass: the furniture follows the contours of the room and takes up no extra floor space.

03Prices

How much does custom built-in furniture cost to make

The "from" price is per linear metre of the item's width or per finished carcass — this is stated in the unit of each line. After the free measurement, the cost is fixed in the contract so it doesn't change during the process.

  • 50% prepayment, the rest after installation and sign-off
  • Kaspi, card, cash, bank transfer for companies
  • 1–2 days for a 3D design, revisions free
  • Kaspi Instalments over 3–24 months with no down payment
Get an exact quote
ItemMaterialLead timePrice
  • Built-in wardrobe for a nicheLaminated chipboard, sliding14 daysfrom 45 000 ₸/⁠lin. m
  • Walk-in closet for a storage roomLaminated chipboard, interior fittings16 daysfrom 55 000 ₸/⁠lin. m
  • Built-in hallway for a nicheLaminated chipboard, MDF16 daysfrom 60 000 ₸/⁠lin. m
  • System under the stairsLaminated chipboard, MDF18 daysfrom 70 000 ₸/⁠lin. m
  • Built-in kitchen with appliancesLaminated chipboard/​MDF25 daysfrom 90 000 ₸/⁠lin. m
  • Hinged built-in wardrobe for a niche with a top cupboardLaminated chipboard, MDF fronts7–10 daysfrom 60 000 ₸/⁠lin. m
  • Straight built-in kitchen without appliancesMDF fronts, quartz countertop7–10 daysfrom 120 000 ₸/⁠lin. m
  • Floor-to-ceiling built-in kitchen with MDF frontsMDF enamel, solid surface countertop7–10 daysfrom 140 000 ₸/⁠lin. m
  • 2-door built-in sliding wardrobe for a nicheEgger laminated chipboard, mirrored doors7–10 daysfrom 250 000 ₸
  • Sliding wardrobe under the stairsLaminated chipboard, mirror7–10 daysfrom 280 000 ₸
  • Corner built-in wardrobe for a nicheLaminated chipboard, alder solid wood7–10 daysfrom 320 000 ₸
  • Walk-in closet system for the bedroom with drawersLaminated chipboard, metal runners7–10 daysfrom 450 000 ₸
  • Custom corner walk-in closetLaminated chipboard, glass fronts7–10 daysfrom 600 000 ₸
  • Walk-in closet room with an islandLaminated chipboard, MDF, solid surface countertop7–10 daysfrom 850 000 ₸
  • Custom corner kitchen with a bar counterMDF film, acrylic countertop7–10 daysfrom 980 000 ₸

04Projects

Completed projects of built-in furniture

01 / 07
A sliding wardrobe into the niche up to the ceiling — MEBLIX project, Esentai City residential complex, Bostandyk district

01 / 07

Floor-to-ceiling sliding wardrobe for a niche

Esentai City, Bostandyk district

A built-in sliding wardrobe in a ready-made floor-to-ceiling niche. No side panels, just flush fronts — the hallway gained 15 cm of space.

Items
niche 2.4 m, 3-door sliding
Materials
Laminated chipboard, mirror
Lead time
14 days
I want the same
A built-in kitchen with appliances — MEBLIX project, Abu Dhabi Plaza residential complex, Medeu district

02 / 07

Built-in kitchen with appliances

Abu Dhabi Plaza, Medeu district

A kitchen with built-in appliances in one line: fridge, oven and dishwasher hidden behind the fronts. The unit reads as a solid wall.

Items
oven, dishwasher, fridge behind the fronts
Materials
Painted MDF
Lead time
28 days
I want the same
A built-in transforming bed — MEBLIX project, Samal-2 microdistrict

03 / 07

Built-in transforming bed

Samal-2 microdistrict

A transforming bed in a one-room apartment niche: by day it lifts to the wall and hides behind a front, at night it folds down. The room also works as a living room.

Items
Murphy bed in a niche, folds away by day
Materials
Laminated chipboard, mechanism
Lead time
18 days
I want the same
A built-in hallway into the niche — MEBLIX project, Izumrudny Kvartal residential complex, Bostandyk district

04 / 07

Built-in hallway for a niche

Izumrudny Kvartal, Bostandyk district

The hallway is built into the niche by the entrance: a closed wardrobe, an open rail and a shoe cabinet below. Everything is flush with the wall, the corridor isn't cluttered.

Items
wardrobe, shoe cabinet, rail
Materials
Laminated chipboard, MDF
Lead time
16 days
I want the same
A built-in wardrobe for the hallway — MEBLIX project, Almaty Arena residential complex, Alatau district

05 / 07

Built-in wardrobe for the hallway

Almaty Arena, Alatau district

A built-in system in the niche by the entrance: a closed hinged wardrobe, a full-length mirror, a bench for changing shoes and open shoe shelves below. Everything is flush with the wall, the narrow corridor isn't cluttered.

Items
wardrobe, mirror, bench, shoe cabinet
Materials
Laminated chipboard, mirror
Lead time
18 days
I want the same
A kitchen in the niche with a refrigerator — MEBLIX project, Orbita-3 microdistrict

06 / 07

Kitchen in a niche with a fridge

Orbita-3 microdistrict

A built-in kitchen along one wall of a khrushchyovka: the appliances are gathered into a column, the fronts match the wall colour. A single background, nothing sticks out into the narrow passage.

Items
straight layout, appliances in a column
Materials
Laminated chipboard/MDF
Lead time
25 days
I want the same
A built-in TV wall for the living room — MEBLIX project, Abu Dhabi residential complex, Medeu district

07 / 07

Built-in TV wall unit for the living room

Abu Dhabi residential complex, Medeu district

A full-wall built-in TV unit for the living room: a cabinet for equipment, glass display cases with lighting, and closed storage sections. Built to the wall size, it looks like a single solid zone.

Items
TV zone, display cases, closed sections
Materials
Laminated chipboard, glass, lighting
Lead time
16 days
I want the same

3 500+

MEBLIX projects since 2013 — we'll show similar ones on WhatsApp or in person at the showroom.

Show similar

05How ordering works

How to order built-in furniture

Book a free measurement
  1. 01

    5 minutes

    Consultation

    Message us on WhatsApp or call. We discuss the task, style and budget, show similar projects and give a price estimate.

  2. 02

    within 24 hours

    Measurement

    The measurer comes free of charge anywhere in Almaty, takes laser measurements accurate to 1 mm, and marks sockets, pipes and uneven walls. Brings samples.

  3. 03

    1–2 days

    3D design and estimate

    We show the furniture in its colours and materials and make changes free of charge until you approve. Price, lead time and installation date are fixed in the contract.

  4. 04

    from 7 days

    Production

    First, the craftsman prepares a drawing of the structure, then the item is pre-assembled in the workshop, and a team of installers goes to the site.

  5. 05

    1 day

    Delivery and installation

    We deliver, bring it in, assemble, set up and adjust the item. After installation we clean up after ourselves.

  6. 06

    24 months

    Sign-off and warranty

    You check every mechanism, sign the certificate and pay the balance. The warranty starts that day, with service response within 1–2 business days.

MEBLIX carpentry workshop in Almaty: workbenches, blanks and machines for working with woodA CNC machine cuts blanks for future furniture according to the designer's drawingsA machine in the workshop processes the ends of parts and drills holes for hinges and slidesA craftsman coats fronts with oil and lacquer in the spray booth of our workshopA craftsman checks the test assembly of the item in the workshop before shipping to the customerA finished built-in wardrobe with oak-look sliding doors and shelves for clothes

01 / 06

06Production

How wardrobes and niche-fit kitchens are made in the workshop

Six steps in our 600 m² workshop. You can see each of them with your own eyes: the showroom and production are under one roof.

  1. MEBLIX carpentry workshop in Almaty: workbenches, blanks and machines for working with wood
    01

    2 mm PVC edge banding

    Board and fronts

    Wet areas require edge protection: 2 mm PVC edge banding is applied on a machine with a milling cutter and polishing, and MDF fronts are sanded and primed before painting.

  2. A CNC machine cuts blanks for future furniture according to the designer's drawings
    02

    Laser measuring to 1 mm

    CNC cutting

    A design engineer prepares the drawings, and the machine cuts the board to them. Dimensions come from a laser measurement accurate to 1 mm.

  3. A machine in the workshop processes the ends of parts and drills holes for hinges and slides
    03

    Blum · Hettich · Boyard

    Edging and drilling

    The edge-banding machine seals the edges, then we drill holes for Blum hinges and Hettich runners.

  4. A craftsman coats fronts with oil and lacquer in the spray booth of our workshop
    04

    Any RAL colour

    Enamel and veneer

    A finishing specialist paints fronts to RAL — matte and gloss.

  5. A craftsman checks the test assembly of the item in the workshop before shipping to the customer
    05

    Pre-assembly in the workshop

    Assembly and inspection

    We assemble the modules in the workshop before dispatch, checking front gaps and drawer travel. The quality control department signs the item off for shipping.

  6. A finished built-in wardrobe with oak-look sliding doors and shelves for clothes
    06

    Installation in 1 day

    Finished item

    We deliver, bring it in, assemble in 1 day, adjust the item and clean up after ourselves. Warranty of 24 months from signing the acceptance certificate.

07Team

Who will make your built-in furniture

MEBLIX workshop craftsmen who make and assemble furniture to order.

01 / 07
Aidyn Bolenov, Cabinet furniture repair craftsman

Aidyn Bolenov

Cabinet furniture repair craftsman20 years

★ 4.99 · 73 ratings

Aleksandr Martynenko, Furniture and kitchen unit assembler

Aleksandr Martynenko

Furniture and kitchen unit assembler23 years

★ 4.97 · 300 ratings

Andrei D., Made-to-order furniture maker

Andrei D.

Made-to-order furniture maker7 years

★ 4.26 · 32 ratings

Akzholtai U., Furniture maker

Akzholtai U.

Furniture maker5 years

★ 4.23 · 30 ratings

Vasilii Krasnov, Joiner and carpenter

Vasilii Krasnov

Joiner and carpenter20 years

★ 5.0 · 113 ratings

Viktor Gurov, Furniture front and hardware fitter

Viktor Gurov

Furniture front and hardware fitter17 years

★ 4.61 · 92 ratings

MEBLIX showroom on Abylai Khan Ave

08Showroom and workshop

Touch the samples for built-in furniture in our showroom

200+ fronts and materials, Blum and Hettich hardware to try in person. The workshop is in the same building.

Address
115/60 Abylai Khan Ave, Almaty
Hours
Daily 10:00–20:00
Phone
+7 705 625 00 03

09FAQ

Frequently asked questions about custom built-in furniture

Didn’t find the answer? Message us — a manager replies, not a bot.

Ask on WhatsApp
01How much does built-in furniture cost?

Built-in furniture is calculated per linear metre: a niche wardrobe and a kitchen with appliances cost differently, and the kitchen is usually the pricier of the two. The exact price depends on the material, contents and hardware. For guide prices by type, see the price list on this page.

02Can you make a built-in wardrobe for a niche of non-standard depth?

Yes, built-in furniture is designed for a specific niche, so the depth and width can be non-standard. During the measurement, the specialist will take exact dimensions and suggest contents based on the available space.

03How does payment work for custom built-in furniture?

Payment in two stages: 50% prepayment before production starts and 50% after signing the acceptance certificate. We work by bank transfer. All terms are fixed in the contract.

04What counts as a warranty case and what counts as mechanical damage?

A defect caused by production or materials is considered a warranty case; mechanical damage (chips, scratches, impact marks) is not covered by the warranty. The exact list of terms is set out in the contract — check it before signing.

05How do I book a measurement for a built-in wardrobe or kitchen?

Leave a request or message us on WhatsApp — we'll agree on a convenient time. Measurement and 3D design are free. The specialist will come with samples of materials and equipment for accurate measurements.

06Can a washing machine or other equipment be built into a wardrobe?

Yes, when designing a built-in wardrobe, a niche can be provided for a washing machine, dryer or another appliance. During the measurement, the specialist will clarify the dimensions of the appliance and ventilation requirements to integrate it correctly.

07Do you deliver built-in furniture outside Almaty?

Yes, delivery is possible outside Almaty. Within Almaty and up to 30 km it is free for a large order; beyond 30 km there is an extra charge. Check the exact delivery cost and time with the manager.

08Who does the installation?

Installation is carried out by our assemblers. The acceptance certificate is signed after installation, once you are satisfied that everything is installed correctly. If there are any remarks, they can be recorded in the certificate.

09Can I see samples of boards and hardware for built-in furniture?

Yes, the showroom at 115/60 Abylai Khan Ave displays samples of Egger and Kronospan boards, as well as Blum, Hettich and Boyard hardware. You can evaluate the texture and color of the materials in person.

10How does built-in furniture solve the problem of niches, uneven walls and sloped ceilings?

Built-in furniture is designed to the actual dimensions of the opening: the niche, protrusions and ceiling slope are covered by the carcass and fronts, and gaps are covered with filler strips. During the measurement, the specialist records the geometry of the walls and ceiling so that the wardrobe or kitchen fits without gaps or on-site adjustment.

10Reviews

What clients say about built-in furniture

4,9

average rating
on Google and Zoon

See all reviews

11Article

Custom built-in furniture in Almaty from the MEBLIX workshop

Temirzhan Nurpeisov, Furniture assembly carpenter
Author
Temirzhan NurpeisovFurniture assembly carpenter
Published
Updated

MEBLIX makes custom built-in furniture in Almaty to individual sizes: wardrobes for niches, kitchens, hallways and walk-in closets. We work as a direct manufacturer — our own 600 m² workshop, free measurement and a 3D design in 1–2 days, installation by our own crews, and a 24-month warranty on the item under the contract.

How built-in furniture differs from cabinet furniture and a freestanding sliding wardrobe

The item is designed around a specific niche or plane, so it behaves differently from a ready-made cabinet wardrobe. Let's break down what the difference is in practice.

What counts as built-in furniture and which types we make

  • Wardrobes for niches: fill the wall space from floor to ceiling, with no side gaps and no decorative back panel.
  • Sliding wardrobes from edge to edge: the carcass is fixed to the side surfaces of the room rather than standing separately on the floor.
  • Built-in kitchens: the unit fits between the walls and reaches the ceiling, with appliances and the sink lined up in a single row.
  • Hallways: narrow sections sized to the corridor, with open and closed storage zones.
  • Walk-in closets: the internal layout is designed around the room, not around a standard carcass.
  • Custom cabinet furniture: freestanding modules to your sizes that can be rearranged.

How a built-in item differs from a freestanding sliding wardrobe

A freestanding sliding wardrobe stands apart from the surfaces of the room, while a built-in one is fixed to them and to the ceiling, so it leaves no gaps and does not collect dust at the sides. A freestanding carcass has its own side panels and back wall — they take up 3–5 cm on each side and eat into the usable depth. A wardrobe for a niche does without side panels: the surfaces themselves do the job, and the internal layout is designed around the actual width of the opening. On uneven surfaces the difference shows up more — a freestanding carcass has to be moved away, and a gap is left behind where dust builds up. Such an item is designed to cover the unevenness without gaps or cover strips. Our workshop makes this furniture to individual sizes, including niches and non-standard geometry — so we allow for unevenness in the design at the measurement stage rather than masking it during installation.

Niches, sloped ceilings and finished renovations — where we build in

We build furniture into niches from 2.4 m, under sloped ceilings and into finished renovations — the measurement shows which details need to be worked around so the walls don't have to be redone. A sloped ceiling in an attic or by a staircase sets the top line of the carcass: it is repeated in the cutting, otherwise a wedge is left that nothing can cover. Curved walls and non-standard geometry are handled with compensation strips and on-site trimming — based on the actual situation, not the drawing. If the renovation is already done, the measurement specialist records the actual dimensions and utilities — the design is built from them rather than from the project documentation, so the walls don't have to be opened up. Our measurement and 3D design are free and take 1–2 days, and the lead times for each option are in the price list on this page. Our advice: don't box in the niche with drywall before the measurement — those extra 5–10 cm of depth can't be won back later.

Materials and hardware for built-in items

The carcass and fronts of a built-in item keep their shape for years if the board and hardware are matched to the load. Here's what we build from and why it matters for these structures.

Egger and Kronospan boards — what we choose for carcasses and fronts

We work with Egger and Kronospan laminated chipboard — two trusted manufacturers whose boards we use to build the carcass and fronts of our items. Both brands deliver stable board geometry: when cut in our 600 m² workshop, the edge banding sits flat, without chips or waves, and the decor matches from batch to batch — which matters when a front is assembled from several panels. For a kitchen, the board is chosen to suit the zone: around the sink and hob, the moisture resistance of the edge matters most, while on fronts it is the decor's resistance to fading near a window. What's more, built-in furniture almost always stands flush against a wall and in a niche, where air circulation is worse than around a freestanding wardrobe — so we are stricter about protecting the end faces. On kitchen units under the sink we use a moisture-resistant carcass, and the upper cabinets above the work area are made from board with dense edge banding on all visible ends.

Blum, Hettich and Boyard hardware and what the 25-year warranty covers

We fit Blum, Hettich and Boyard hardware; Blum supplies hinges, lift mechanisms and drawer runners, and it carries a 25-year manufacturer's warranty. This manufacturer does not make table-folding mechanisms, so we build those units from the Hettich and Boyard ranges — matched to the load and the way they open. The 25-year warranty applies specifically to Blum hardware, not to the whole item: the carcass itself is covered by our 24-month warranty under contract, so these terms are listed separately in the specification. For a wardrobe in a niche, the hinges go through more cycles than in a freestanding one: the door is opened more often and wider, and the gap to the wall stops it from swinging past the restrictor. Skimping on the lift mechanisms of upper sections is a false economy — with daily use, it is the soft-close that determines how quietly and smoothly the front closes a couple of years down the line.

Comparing item specification options

specification layers and how they affect the item
Specification layerOptionsWhat it affects
Carcass and front boardEgger laminated chipboard, Kronospan laminated chipboardstrength, decor durability
HardwareBlum, Hettich, Boyardsmooth operation, service life
Interior fittingsrails, shelves, drawersstorage convenience

How ordering works from request to installation

Ordering a built-in item is a chain of steps where each one builds on the previous. Here is what happens after your request and what you get at each stage.

Measurement and 3D design — what's included and how long it takes

Measurement is free, and we prepare the 3D design in 1–2 days — it shows how the future wardrobe will fit into the niche and how it will open. The measurement specialist records the geometry of the opening, any deviations in the walls and ceiling, and the position of sockets and pipes, and the designer transfers these dimensions into a model tied to the specific hardware. On screen you see not a rough sketch but the layout of the sections, the carcass depth and the direction the doors open. Custom built-in furniture in Almaty often comes down to uneven walls — we record this at the measurement stage so that fronts don't have to be trimmed on site. We sign off the design before it goes to the workshop: changes at this stage are free, but once the board has been cut, the dimensions can't be changed.

Manufacturing in the workshop and a test assembly before dispatch

We make the construction in our own 600 m² workshop — cutting, edge banding, painting and test assembly all happen there, and the lead time for each option is shown in the price list on this page. Production of such items starts with cutting Egger and Kronospan boards on a CNC machine: parts get their exact dimensions from the 3D model rather than being marked out by hand. Next, edge banding seals the ends, painting gives the fronts their finish, and everything comes together in the test assembly area. Here the carcass is assembled in full, Blum hinges, lift mechanisms and drawer runners are fitted, and the movement of the doors is checked. Test assembly catches what you can't see on a drawing: mismatched edges, drawer movement, gaps at the joints — the furniture arrives on site already checked. A rush order is possible, but we agree on it at the measurement, not in the middle of the work.

Installation by our own crews and signing of the acceptance report

Our own installation crews come to fit the furniture, and we sign the acceptance report after installation — once you have seen the wardrobe in place and checked how it opens. The crew works to the contract and the project: they level the carcass, join the sections together, hang the fronts and adjust the gaps, and connect the lighting if it is in the specification. The installers do not rework the geometry "on site" — any deviations in the opening were already allowed for in the project drawn up at the measurement. The report comes after installation, not before — that is the point where you check the result: before signing you can point out gaps or how the doors move, and they are fixed before the order is closed. The balance is paid after the report is signed, so there is no reason to rush the signature — check first.

Manufacturer or middleman and why it matters

There are many listings and ads in Almaty search results, and a workshop is not always behind them. We explain how to tell a direct manufacturer from a middleman and why that difference affects the result.

How to tell that a company has its own workshop

A direct manufacturer has its own workshop with cutting, edge banding, painting and test assembly areas — ours is 600 m² in Almaty, and the whole cycle happens in one place. Our built-in furniture production is concentrated in this same workshop, so every stage is supervised by our technicians. We cut and edge the carcass and fronts on our own equipment, paint them in our own workshop, and before dispatch we assemble the construction in full to catch any skew or gaps before it goes to site. Having a workshop is easy to check: ask to see the areas and to explain which operations are done on the side. With a middleman the answer usually comes down to "they make it for us" with no detail on the stages. Another marker is who handles the measurement and the project: with us the measurement and the 3D project are done by our own specialists, not an outside contractor. A middleman between you and the workshop adds an extra layer of approvals: project changes take longer, and responsibility for installation is blurred between the seller and the contractor.

Why installation by our own crews changes the result

Installation by our own crews means the same manufacturer that assembled the structure in the workshop is responsible for fitting it — not a third-party team seeing the project for the first time. Our installers work from the project and know where the fastening points run and what clearance is left for a stretch ceiling. Such structures almost always run into non-standard geometry: a curved wall, a slanted niche, an uneven floor. When a different crew handles installation, such a junction more often ends up being redone — the part goes back to the workshop and the lead time slips. Our craftsmen know the joints and tolerances of their own work, so a tricky junction in a niche is solved on site rather than sent back for reassembly. For you there is also a single point of responsibility: the manufacturer is answerable for both production and installation, not two separate contractors with different contracts.

Acceptance, warranty and payment

The customer's main fear is paying upfront and being left with defects. We break down how acceptance, warranty and payment work so that this fear is removed by facts, not promises.

What we check on acceptance and how we sign the act

We sign the acceptance act after installation: you check how doors and drawers open, how the item sits in the niche and whether there are gaps at the joints. Installation crews work under contract, so every acceptance point is not a formality but a recorded obligation: we record the geometry of the opening at the measurement, and on site you compare the result with the project with your own eyes. Built-in custom furniture is checked especially carefully: the carcass must fit precisely into the niche without skewing. The junction of the carcass with an uneven wall is especially visible — that is what we check first. We also look separately at the edge banding on the ends of shelves and fronts: it must not come away or catch your finger. We check the hardware under load — a door with a soft-close mechanism must not slam, a drawer at full extension must not wobble. If something does not fit after installation, it is recorded before the act is signed — so the defect goes into the work right away instead of turning into a separate warranty claim.

24-month warranty and 25 years on Blum hardware

We give a 24-month warranty on the item under contract, and Blum hardware carries the manufacturer's 25-year warranty — these are two different terms, and both are written into the documents. Blum hinges, lift mechanisms and drawer runners are mechanics with factory responsibility, so their term is longer than for the carcass: laminated chipboard, edge banding and painting are covered by our contract, not by the board manufacturer. The Hettich and Boyard warranty is calculated under the contract, so the specification states next to each item whose term applies to it. This split is convenient when making a claim: you don't guess who to go to but look at what exactly has failed. The split of terms matters when making a claim: if the problem is in a Blum hinge or runner, the manufacturer's warranty applies, and if it is in the carcass or edge banding, our warranty under contract applies.

50/50 payment after the act and cashless settlement

Payment works like this: a 50% deposit, with the remaining 50% due after the acceptance certificate is signed; we work by bank transfer. The deposit starts production for a specific project — material is cut separately for each customer, so it cannot be returned to production. You transfer the balance when the work is accepted, not when the calendar deadline has passed. Bank transfer is also convenient because the payment keeps documentary proof — in disputes over deadlines this is easier than hunting for a paper receipt. Custom furniture under this scheme is protected against the situation where the money is gone and there is nothing to base a claim on. The 50/50 scheme ties the second half of the payment to the result, not the calendar: you pay the balance only after signing the acceptance certificate.

The bottom line on built-in furniture

We have gathered the essentials to keep in mind before ordering a built-in item: from design features to the sequence of steps and the documents that record the result.

  • Construction for a niche: such an item is designed for the wall, ceiling and finished opening, so no gaps remain, but you will no longer be able to move it like a freestanding wardrobe.
  • Materials and mechanics: the carcass and fronts are assembled from Egger or Kronospan boards, while smooth opening is ensured by Blum, Hettich or Boyard hardware.
  • Sequence of steps: first the measurement, then the 3D design, production in the workshop, trial assembly, installation and signing of the acceptance certificate after installation.
  • Direct manufacturer: such a contractor has its own workshop and installation teams, rather than being limited to a listing in a catalog.
  • Warranties: the term for the item itself and the manufacturer's term for the hardware differ, and both conditions are written into the contract.

12Calculation

What affects the estimate for a wardrobe or kitchen fitted into a niche

In the calculator, choose the item type, front material and width — the calculation will go to the manager on WhatsApp, and they will clarify the interior layout and hardware.

01Item

02Length niche or wall width

2 linear m
1 linear m8 linear m

03Add

13Other materials

We also make things beyond built-in furniture