Almaty Daily 10:00–20:00 +7 705 625 00 03 Book via WhatsApp
Hotel room with a double bed, soft headboard, cabinets and a walnut veneer wardrobe

For business · Hotels

Furniture for hotels in Almaty

We furnish rooms, lobby and reception with one series: first a pilot room, then the whole floor in one decor. Measurement and 3D design are free, the price is fixed in the contract, warranty on the item is 24 months.

Measurement and 3D design are free and carry no obligation · price fixed in the contract · Kaspi Instalments up to 24 months

★ 4,9
Google rating
from 6 days
lead time
24 mo.
warranty under contract

Turnkey room: bed with headboard, cabinets, wardrobe and desk in one decor

02Hotel projects

Completed furniture projects for hotels

Property type, volume, materials and lead time — per project.

  • Turnkey boutique hotel rooms — Boutique hotel, Medeu district, AlmatyHotel

    Turnkey boutique hotel rooms

    Boutique hotel, Medeu district, Almaty

    Fitted out 24 boutique hotel rooms in a single style: beds with headboards, bedside tables with sockets, wardrobes and desks. We built a pilot room, approved it and launched the series.

    Volume
    24 rooms: beds, bedside tables, wardrobes, desks
    Materials
    25 mm laminated chipboard, HPL, oak veneer
    Lead time
    42 days
    I want the same
  • Reception desk and hotel lobby area — Hotel, Bostandyk district, AlmatyHotel

    Reception desk and hotel lobby area

    Hotel, Bostandyk district, Almaty

    Made a reception desk in two heights with lighting and the hotel logo, and in the lobby — sofas and coffee tables in contract fabric. All in one style for the welcome area.

    Volume
    reception desk + lobby sofas and tables
    Materials
    25 mm laminated chipboard, HPL, contract fabric
    Lead time
    24 days
    I want the same
  • Minibars and TV panels in the rooms — Hotel, Almaly district, AlmatyHotel

    Minibars and TV panels in the rooms

    Hotel, Almaly district, Almaty

    A batch of 40 minibar cabinets with ventilation niches and TV panels with hidden mounting and a cable channel. A single finish across all rooms, the cable outlet hidden inside the panel.

    Volume
    40 minibar cabinets and TV panels
    Materials
    18/25 mm laminated chipboard, HPL, cable channel
    Lead time
    20 days
    I want the same
  • Sliding wardrobes for compact rooms — Aparthotel, Auezov district, AlmatyHotel

    Sliding wardrobes for compact rooms

    Aparthotel, Auezov district, Almaty

    For the aparthotel's compact rooms we made 32 sliding wardrobes with sliding doors and a mirrored leaf. They don't take up space for swinging open, and inside there's a niche for a safe and luggage.

    Volume
    32 sliding wardrobes with a mirror
    Materials
    18 mm laminated chipboard, sliding system
    Lead time
    22 days
    I want the same
  • Headboards and wall panels for a floor — Hotel, Bostandyk district, AlmatyHotel

    Headboards and wall panels for a floor

    Hotel, Bostandyk district, Almaty

    We styled a floor with wall-mounted bed headboards with built-in lighting and sockets. With one element we set a recognizable style for the whole floor — the rooms started to look more expensive.

    Volume
    wall-mounted headboards with lighting, 18 rooms
    Materials
    MDF, HPL, soft upholstery
    Lead time
    19 days
    I want the same
  • Desks and mirror consoles for the rooms — Business hotel, Medeu district, AlmatyHotel

    Desks and mirror consoles for the rooms

    Business hotel, Medeu district, Almaty

    For the business hotel we combined a desk and a mirror console into one module: HPL worktop, sockets, LED lighting. We saved space in the room and gave the guest a comfortable workspace.

    Volume
    28 desks with mirror consoles
    Materials
    25 mm laminated chipboard, HPL, mirror, LED
    Lead time
    21 day
    I want the same

03How we work with hotels

How ordering furniture for hotels works

Book a measurement at your property
  1. 01

    5 minutes

    Consultation

    Message us on WhatsApp or call. We discuss the task, style and budget, show similar projects and give a price estimate.

  2. 02

    within 24 hours

    Measurement

    The measurer comes free of charge anywhere in Almaty, takes laser measurements accurate to 1 mm, and marks sockets, pipes and uneven walls. Brings samples.

  3. 03

    1–2 days

    3D design and estimate

    We show the furniture in its colours and materials and make changes free of charge until you approve. Price, lead time and installation date are fixed in the contract.

  4. 04

    from 6 days

    Production

    In the workshop we cut the laminated chipboard, edge all ends with 2 mm PVC, assemble the upholstered furniture and do a test assembly of the series before shipping. Lead times for each option are in the price list on this page, and rush orders are possible.

  5. 05

    1 day

    Delivery and installation

    We deliver, carry in, assemble, place and adjust the furniture. After installation we clean up after ourselves.

  6. 06

    24 months

    Sign-off and warranty

    You check every mechanism, sign the certificate and pay the balance. The warranty starts that day, with service response within 1–2 business days.

04Prices

Prices for custom hotel furniture

The "from" price is for one item in the base configuration: laminated chipboard carcass, PVC edge on all ends and hardware. A wholesale price applies to a series of rooms, and the final amount is fixed in the contract after a free measurement.

  • 50% prepayment, the rest after installation and sign-off
  • Kaspi, card, cash, bank transfer for companies
  • 1–2 days for a 3D design, revisions free
  • Kaspi Instalments over 3–24 months with no down payment
Get an exact quote
ItemMaterialLead timePrice
  • Bedside cabinet "Night"16 mm laminated chipboard, 2 mm PVC edgefrom 6 daysfrom 24 000 ₸
  • Luggage rack "Luggage"18 mm laminated chipboard, textile strapsfrom 6 daysfrom 26 000 ₸
  • Bench for a room "Banquet"25 mm moisture-resistant laminated chipboard, foam, anti-vandal fabricfrom 7 daysfrom 32 000 ₸
  • Mini-bar cabinet "Minibar"18 mm laminated chipboard, ventilation nichefrom 7 daysfrom 36 000 ₸
  • Bed headboard "Headboard"MDF, HPL or soft upholsteryfrom 8 daysfrom 38 000 ₸
  • Desk for a room "Desk"25 mm laminated chipboard, HPL worktopfrom 8 daysfrom 40 000 ₸
  • Walk-in closet area "Open"18 mm laminated chipboard, metal railfrom 8 daysfrom 44 000 ₸
  • Coffee table "Lobby table"12 mm HPL worktop, powder-coated metal framefrom 10 daysfrom 45 000 ₸
  • TV panel "Media"18/25 mm laminated chipboard, HPL, cable channelfrom 8 daysfrom 46 000 ₸
  • Wardrobe for a room "Room"18 mm laminated chipboard, wear-resistantfrom 9 daysfrom 58 000 ₸
  • Hotel armchair "Arm"Solid beech, 35 kg/​m3 foam, fabric or faux leatherfrom 12 daysfrom 58 000 ₸
  • Hotel bed "Standard"25 mm laminated chipboard, HPL headboardfrom 10 daysfrom 68 000 ₸
  • Sliding wardrobe for a room "Slide"18 mm laminated chipboard, sliding systemfrom 12 daysfrom 74 000 ₸
  • Lobby sofa "Lounge"Laminated chipboard/​plywood carcass, contract fabricfrom 18 daysfrom 155 000 ₸
  • Hotel reception desk "Front desk"25 mm laminated chipboard, HPL, millingfrom 16 daysfrom 195 000 ₸

05For businesses

We supply hotel furniture to businesses with contract and invoice

We work with LLPs and sole traders on bank transfer. The price, materials and lead times are in the contract before production starts: the furniture fits into the property's opening schedule.

Request a contract and invoice
  1. 01Contractprice, materials, lead times and installation date — before we start
  2. 02Estimate and 3D designfree, within 1–2 days after measurement
  3. 03Invoice for paymentbank transfer for LLPs and sole traders
  4. 04Closing documentsacceptance certificate and delivery note after installation
50%
deposit, balance — after the acceptance certificate
Bank transfer
for LLPs and sole traders; private clients — card and cash
24 mo.
warranty on items per the contract
Series
the whole room stock or a floor — one estimate and one contract
Pilot sample
for a series we first make one sample — approve it and launch the run

06Principles

Why hotel room furniture is better made to order

  1. 01

    Pilot room before the series

    First we build and approve a pilot room sample from the same boards and hardware that will go into the series, and only then launch the batch for the floor.

  2. 02

    One finish for the whole floor

    We produce a floor as a single series in one decor under one estimate and one contract, and later accept repeat orders for the same series using the same drawings.

  3. 03

    Edge banding on every end

    We seal all laminated chipboard ends with 2 mm PVC edge banding, including hidden ones: an exposed cut absorbs water during wet cleaning and swells first.

  4. 04

    Electricals built into the design

    We build sockets, switches and cable channels for the TV panel and headboard into the 3D design so that after installation we don't have to drill into finished furniture.

  5. 05

    Fabrics that can be washed

    We upholster lobby benches, armchairs and sofas in contract anti-vandal fabrics or eco-leather over high-density foam.

  6. 06

    Floor-by-floor installation

    In a working hotel we install floor by floor with our own crew and coordinate the schedule with management so the other rooms keep welcoming guests.

A stack of Egger and Kronospan laminated chipboard sheets in our workshop warehouse before cutting for commercial furnitureA CNC machine cuts a laminated chipboard sheet into furniture parts for the venue according to the drawingsAn edgebanding machine seals the ends of parts with 2 mm PVC edge in the MEBLIX workshop in AlmatyA craftsman coats MDF fronts with enamel in the paint booth of our workshopA craftsman checks the test assembly of an item in the workshop before shipping to the customer's siteA finished TV panel with a console and lighting after installation in a hotel room

01 / 06

07Production

How we produce hotel furniture in our own workshop

Six steps in our 600 m² workshop. You can see each of them with your own eyes: the showroom and production are under one roof.

  1. A stack of Egger and Kronospan laminated chipboard sheets in our workshop warehouse before cutting for commercial furniture
    01

    Egger · Kronospan · E1

    Board

    Egger and Kronospan boards of emission class E1 arrive at the workshop warehouse. 40+ laminated chipboard decors, 16–18 mm thick. Class E1 — for halls, rooms and guest rooms.

  2. A CNC machine cuts a laminated chipboard sheet into furniture parts for the venue according to the drawings
    02

    Laser measuring to 1 mm

    CNC cutting

    A design engineer prepares the drawings, and the machine cuts the board to them. Dimensions come from a laser measurement accurate to 1 mm.

  3. An edgebanding machine seals the ends of parts with 2 mm PVC edge in the MEBLIX workshop in Almaty
    03

    Blum · Hettich · Boyard

    Edging and drilling

    The edge-banding machine seals the edges, then we drill holes for Blum hinges and Hettich runners.

  4. A craftsman coats MDF fronts with enamel in the paint booth of our workshop
    04

    Any RAL colour

    Enamel and veneer

    A finishing specialist paints fronts to RAL — matte and gloss. For a room series a control assembly is mandatory: we assemble a pilot sample and every batch in the workshop before shipping so that no parts need fitting on the floor.

  5. A craftsman checks the test assembly of an item in the workshop before shipping to the customer's site
    05

    Pre-assembly in the workshop

    Assembly and inspection

    We assemble the modules in the workshop before dispatch, checking front gaps and drawer travel. The quality control department signs the item off for shipping.

  6. A finished TV panel with a console and lighting after installation in a hotel room
    06

    Installation to fit the opening schedule

    Finished item

    We deliver, carry in, assemble in 1 day, adjust the furniture and clean up after ourselves. From signing the acceptance act — a 24-month warranty.

08Team

Who will make furniture for your hotel

MEBLIX workshop craftsmen who make and assemble furniture to order.

01 / 07
Aidyn Bolenov, Cabinet furniture repair craftsman

Aidyn Bolenov

Cabinet furniture repair craftsman20 years

★ 4.99 · 73 ratings

Aleksandr Martynenko, Furniture and kitchen unit assembler

Aleksandr Martynenko

Furniture and kitchen unit assembler23 years

★ 4.97 · 300 ratings

Andrei D., Made-to-order furniture maker

Andrei D.

Made-to-order furniture maker7 years

★ 4.26 · 32 ratings

Akzholtai U., Furniture maker

Akzholtai U.

Furniture maker5 years

★ 4.23 · 30 ratings

Vasilii Krasnov, Joiner and carpenter

Vasilii Krasnov

Joiner and carpenter20 years

★ 5.0 · 113 ratings

Viktor Gurov, Furniture front and hardware fitter

Viktor Gurov

Furniture front and hardware fitter17 years

★ 4.61 · 92 ratings

09FAQ

Frequently asked questions about custom hotel furniture

Didn’t find the answer? Message us — a manager replies, not a bot.

Ask on WhatsApp
01Can I first order furniture for one room and then for the whole floor?

Yes, that's how we work: first we make a pilot room and get it approved, then we launch the series for the floor. Later we accept repeat orders for the same series using the same drawings and the same decor.

02How do I place an order for hotel furniture from a LLP or sole proprietor?

We sign a contract and issue an invoice for bank transfer. 50 % prepayment, the remaining 50 % — after signing the acceptance act, which we sign after installation. Closing documents — the act and the invoice.

03How much does furniture for one standard room cost?

It depends on the set: the price list above includes a hotel bed and a bedside cabinet, plus a wardrobe, desk and minibar. We calculate the exact estimate for a room and a series after a free measurement, and a wholesale price applies to a series.

04Do you make furniture for hostels and mini-hotels?

Yes. For short stays an open walk-in closet area instead of a wardrobe, a luggage rack and a compact cabinet is often enough — it's cheaper and quicker to clean. We select the set during the measurement to fit the room's area.

05Can furniture be replaced without closing the hotel?

Yes. We install floor by floor with our own crew: while assembly is underway on one floor, the others keep welcoming guests. We coordinate the order of floors and working hours with the hotel management in advance.

06How long is the warranty on hotel furniture?

We give a 24-month warranty on the item under the contract. Blum hardware carries a 25-year manufacturer's warranty; Hettich and Boyard have their own terms — we specify which hardware is used on each item in the specification.

07Can I order only a reception desk, without furniture for the rooms?

Yes, we also make the reception desk as a separate order, and its price is given in the price list above. We design it in two heights, with cable channels and space for the administrator's equipment, and match the decor to the existing lobby.

08Will you be able to make the furniture by the opening of a new hotel?

Yes, if time is allowed for a pilot room. The lead time for each item is shown in the price list above, and for an opening an urgent order is possible. We schedule installation around the hotel's launch date.

09Where can I see decors, fabrics and countertops before ordering?

Our showroom has samples of laminated chipboard decors, fabrics and countertops. They're easy to compare side by side so that the rooms, corridor and lobby come together into one picture.

10Do I need a ready-made design project to order furniture for a hotel?

Not necessarily. We visit the site for a measurement free of charge and create a 3D room layout design in 1–2 days. If the hotel has a designer, we work from their drawings and approve the pilot sample with them.

10Reviews

Reviews about furniture for hotels

4,9

average rating
on Google and Zoon

See all reviews

11Article

Furniture for guesthouses and hotels in Almaty from the MEBLIX workshop

Temirzhan Nurpeisov, Furniture assembly carpenter
Author
Temirzhan NurpeisovFurniture assembly carpenter
Published
Updated

MEBLIX makes hotel furniture in its own 600 m² workshop in Almaty: beds, wardrobes, cabinets, minibars, reception desks and soft lobby furniture. Before the series, we assemble a pilot room and approve it, produce the entire floor in one decor, install it floor by floor with our own team, and give a 24-month warranty on the item under the contract.

What hotel furniture is needed in a room by zones

A guest room is conveniently divided into sleep, storage, work and luggage zones. We break down which items cover each of them and what to think about already at the planning stage.

Sleep zone with a bed, headboard and bedside cabinets

We assemble the sleep zone from a hotel bed, a headboard and a pair of bedside cabinets — this is where the room gets its recognizable style. The bed carcass is cut from 25 mm laminated chipboard, the headboard is made of MDF, with HPL coating or soft upholstery, and the cabinets — from 16–18 mm board with PVC edge on every end. When hotel furniture is designed for a specific floor, the headboard height is selected to match the window and sconces, and the cabinet width — to match the passage between the bed and the wall. A full-wall headboard works as a wall panel: it hides wires, protects the wallpaper from hits by the backrest and sets the rhythm of a corridor of identical doors. Sockets, switches and cables to the TV are laid into the headboard and TV panel with a cable channel already in the design — moving them after installation means drilling into the finished series.

Storage and luggage in a compact room

In a tight room we install a sliding wardrobe or an open wardrobe area instead of a hinged wardrobe so the doors don't eat up the passage. A sliding wardrobe with a mirror door also replaces a separate mirror, and inside we leave a niche for a safe and a suitcase. The open area — a rail, a shelf and a couple of hooks — suits a hostel or a mini-hotel where a guest stays one or two nights. We make the minibar cabinet with a ventilation niche: the fridge needs air, otherwise it heats the carcass and makes noise at night. The bench by the bed is upholstered in anti-vandal fabric, the luggage rack is assembled on textile straps — suitcase wheels and locks don't scratch the board. Such furniture for hotel rooms is produced by us as one series in one decor, so the wardrobe, cabinet and luggage rack match in shade. The luggage rack is best placed at the entrance or by the wardrobe, not by the bed: an open suitcase there blocks the way to the bathroom.

Room items and what to check in them

basic set of a guest room by zones
ItemZoneWhat we check
Bed with headboardSleepHeadboard height, socket outlets
Bedside cabinetSleepDrawer runners, edge on ends
Wardrobe or sliding wardrobeStorageNiche for safe and suitcase
Minibar cabinetStorageVentilation niche for the fridge
Desk and mirror consoleWorkHPL on the countertop, LED lighting
Luggage rack and benchLuggageStraps, washable fabric

Materials that withstand daily cleaning

In a hotel, surfaces are wiped every day, and suitcases are rolled along the corners of wardrobes. We show what we make carcasses, countertops and frames from so they survive such a regime without chips and swelling.

Carcass made of laminated chipboard and edge on all ends

We cut the carcasses from E1-class Egger and Kronospan laminated chipboard 16–18 mm thick, and we seal all edges — not just the front ones — with 2 mm PVC edge banding. The board's melamine coating withstands wet cleaning, but laminated chipboard has one weak spot: an exposed cut absorbs water and swells. That is why hotel furniture never leaves our workshop with a bare edge, even where it is not visible — at the back panel, under the plinth, on the inner shelves. The 2 mm edge is thicker than a decorative one and takes the hit of a vacuum cleaner or a suitcase wheel without peeling at the corner. Cutting and edge banding run in our own section of the workshop, so we set the thickness and type of edge ourselves rather than taking whatever a subcontractor has. When choosing a decor, it is worth looking at the sample in daylight: gloss shows every fingerprint, while a matte woodgrain structure forgives marks from a cloth.

HPL and solid surface countertops

We finish work desks, consoles and the tops of minibars with HPL laminate or solid surface: such surfaces do not fear hot cups, spilled coffee or daily cleaning with detergents. HPL is a high-pressure laminate, harder than melamine, and it does not dent under a handle or a suitcase leg. We use solid surface where a seamless one-piece top is needed — on the console by the mirror or the stand in the lobby. We cut countertops 25 mm thick: on such a sheet no sag is visible, even if the work desk runs along the whole wall under the TV. The higher the room category, the more often the client asks for stone, but in standard rooms HPL serves just as well. It is better to round the countertop edge where elbows rest — a right angle in a walkway is the first to take hits and chips.

Which material works where in a hotel

surfaces for the load of different zones
MaterialWhere it goesWhat it withstands
E1 laminated chipboard 16–18 mmWardrobe, nightstand and bed carcassesWet cleaning, impacts with edge banding
HPL laminateCountertops, TV panels, receptionHeat, spills, scratches
Solid surfaceConsoles, standsWater, stains, seamless joints
Contract fabric, faux leatherSofas, armchairs, benchesFrequent cleaning, abrasion
Powder-coated steelSide tables, hangers, legsLoad, washing, corrosion

A hotel furniture series through a pilot room

A floor of dozens of identical rooms repeats any mistake as many times as it has doors. Here is how we check a series before launch and how we keep the same decor on a repeat order.

Why assemble a pilot room before the series

Before the series we make a pilot room sample and sign it off with the client — only after the signature do we launch the batch. The pilot is assembled from the same boards, edge banding and hardware that will go into production, so it shows the real shade of the decor under the light of a specific building, not a picture in a 3D design. In it they check how the wardrobe doors open next to the bed, whether there is enough room for the housekeeper's cart, at what height the sockets end up by the headboard. Everything changed in the pilot we carry over into the series drawings, and every item passes a test assembly in the workshop before dispatch. Why spend time on a single sample? A fix in the pilot is one part, while a fix after the series is released is the whole batch and a second installation.

One decor per floor and repeat orders in the same series

We produce a hotel floor as one series in one decor, under one estimate and one contract per property. Furniture for hotels is usually ordered in stages: first one floor or building, then the next a season later, and the guest should not notice that the rooms were made at different times. For this we accept a repeat order into the same series later — using the same drawings and the same hardware. Board batches from one manufacturer may differ slightly in tone, so with a repeat order we compare the new sheets against a sample from the first batch. The wholesale price is calculated per series, not per individual item. It is worth fixing the decor, edge banding and hardware article numbers in the contract specification: it is a short list that a year later will save you from hunting for that very shade.

What to check in the pilot room

  • Passages: a guest with a suitcase and a housekeeper with a cart can pass freely between the bed, wardrobe and desk.
  • Doors and drawers: the fronts do not catch on the bed or walls, and the nightstand drawers pull out fully and close without a bang.
  • Electrics: sockets by the headboard and desk are where the guest actually charges a phone, and the TV cable is hidden.
  • Decor under light: the shade of the board and upholstery is checked under the room's evening lighting, not only in daylight.
  • List of comments: all changes are recorded in a single list and signed off before the batch is launched, so there is no arguing about them later.

Furniture for the lobby and the reception desk

The welcome area works around the clock and sees more people than any room on a floor. Here is how we make the check-in desk, sofas and coffee tables for such a flow.

A reception desk for guest flow

We make the reception desk from 25 mm laminated chipboard with HPL on the work surface and a milled facade — passports, key cards, bags and elbows slide across it every day. It is designed at two heights: the upper level for the guest filling in a form while standing, the lower one as the administrator's workplace with a monitor and terminal. Inside we allow for cable channels, document drawers and space for a printer, so cables do not dangle under the countertop. The logo and lighting are built into the facade at the design stage, and the corner of the desk that suitcases most often hit is reinforced with edge banding and a rounded profile. The desk is the largest item in the lobby, and it is fully assembled at our control assembly before being taken apart for delivery. It is worth deciding in advance how many administrators work the peak shift: the length of the lower level depends on it.

Sofas and armchairs in contract fabric

We build the lobby's upholstered furniture on a frame of plywood and timber with high-density PU foam and cover it in contract anti-vandal fabrics or eco-leather that can be washed. Ordinary furniture fabric in a hall quickly wears through on the armrests and collects coffee stains, while contract fabric is designed for frequent cleaning. The dense filling does not sag where people sit dozens of times a day — the seat stays even after several seasons. Next to them we place coffee tables with an HPL top on a powder-coated steel frame: they are safe to wipe down and move across the floor. Such furniture for hotels holds its shape without removable covers that later have to be washed and fitted. It is more convenient to compare fabric and eco-leather samples in the showroom, placing them next to the desk decor — that way you can see whether the lobby comes together into one picture.

Mistakes when fitting out a lobby

  • Household fabric: upholstery without contract-grade durability wears through on the armrests in the first season and handles cleaning poorly.
  • Low seating: a deep low sofa is uncomfortable for a guest with a suitcase who is waiting to check in for just a few minutes.
  • Reception desk with no spare capacity: the length is sized for one administrator, and a queue forms at check-in hours.
  • Separate projects: the lobby and the reception desk are ordered at different times, and the wood, fabric and metal finishes don't match.

Installing hotel furniture in a working hotel

You can replace the furnishings without closing the whole building or losing occupancy. We describe the measurement, the design and the floor-by-floor installation sequence so that guests in neighbouring rooms barely notice a thing.

Site measurement and 3D room design

We measure the site and produce a 3D room layout design free of charge, and it takes 1–2 days. On site we measure the walls, niches, window reveals, electrical outlets and bathroom doors, because even within one building rooms of the same type often differ by a few centimetres. The design shows how the bed, wardrobe, desk and minibar fit in, where the guest will walk and where the housekeeping trolley will turn. From the same design we calculate the budget for the whole floor and prepare drawings for the pilot sample. If the building has several room types — standard, double, family — each type should be measured rather than copying the dimensions of one onto all: a mistake in a wardrobe niche can later only be fixed by reworking the carcass.

Floor-by-floor installation by our own team

In a working hotel we install the furnishings floor by floor with our own team — no subcontractors who don't know the project. While assembly is underway on one floor, the others keep taking guests; we agree the schedule with management around occupancy and season. We make hotel furniture in our own 600 m² workshop in Almaty, and every item undergoes a test assembly before dispatch, so on site the team assembles pre-checked units rather than adjusting them on the spot. Delivery in Almaty and up to 30 km is free on a large order, beyond that for an extra charge. For a new building opening, we schedule installation around the launch date. The more precisely the floor sequence is agreed in advance, the fewer rooms are out of sale at the same time.

How to prepare a floor for installation

  • Clearing the rooms: the floor is closed to check-in in advance and the old furnishings are removed before the team arrives with the items.
  • Lift and entrance: the service lift or staff entrance is booked for the delivery hours so the boxes don't go through the lobby.
  • Noise hours: work with tools is agreed with the administrator for daytime hours when the neighbouring floors are empty.
  • Electrics and finishing: sockets, lighting and wall painting are finished before installation, otherwise the furniture will have to be removed again.
  • Responsible person: there is someone from the hotel on the floor who signs off the work for each room and signs the documents.

Contract, payment and warranty for a hotel as a legal entity

For a LLP and sole proprietor it matters what paperwork remains in hand after the order and how payments are structured. We describe the contract, the payment procedure and the warranty on items and hardware.

Documents and payment procedure for a LLP and sole proprietor

For LLPs and sole proprietors we work under a contract and invoice, with non-cash payment. The prepayment is 50 %, and the remaining 50 % is paid after the acceptance certificate is signed, and we sign the certificate after installation. The closing documents are the certificate and the delivery note, and they are enough for the hotel's accounting department to put the furnishings on the books. The entire series for the property goes under one estimate and one contract, so you don't have to reconcile a dozen separate invoices for beds, wardrobes and the reception desk. Prices for each item are in the price list above on this page, and the lead times for each option are listed there too, and a rush order is also possible. Tying the second payment to the certificate is convenient for the customer: the money goes for a floor that has been assembled and accepted, not for parts that are yet to be assembled.

Warranty on items and hardware

We give a 24-month warranty on items under the contract — it is written into the same document as the series specification. Over 13 years we have completed more than 3 500 projects, and we have made furniture for hotels in Almaty for 20+ hotels and treat such orders as a separate load class. We fit hinges, lift mechanisms and drawer runners from Blum, Hettich or Boyard. Blum has a 25-year manufacturer's warranty, Hettich and Boyard have their own, so the specification should show which hardware goes on which items. For wardrobe doors and cabinet drawers that are opened many times during a cleaning shift, this is not a formality: it is the mechanisms that wear out before the carcass. If a repeat order is needed later, the warranty is calculated for the new batch under its own contract.

A ready-made series or custom furniture

A ready-made series suits a hotel if the rooms are standard sizes and style does not matter for positioning. A catalogue set is delivered faster, but it rarely fits real niches: the wardrobe leaves a gap to the wall, the bed blocks a socket, the cabinet does not fit by the window. Custom furnishings are designed to the measurements of each room type, in the chosen decor and with the required board thickness, so they are easier to reorder and repair from the same drawings. For a hostel with an open wardrobe and standard beds the difference is smaller, for a boutique hotel with full-wall headboards it is more noticeable. It is fairer to compare options not by the price of the set, but by how many years the room will stand without replacing fronts and edge banding.

The bottom line on hotel furniture

Hotel furnishings pay off when they are designed for real rooms, the load and the building's operating schedule. Below is a short list of what to keep in mind before ordering, budgeting and agreeing the project with the manager.

  • Room zones: the set of items is made up of sleep, storage, work and luggage zones, and electrics are planned into the project in advance.
  • Materials: E1-class board with edge banding on all ends, HPL on worktops and contract fabrics withstand daily cleaning.
  • Pilot before the series: one approved sample room saves you from redoing a whole batch and from disputed remarks.
  • One decor: a series under one specification lets you later reorder a floor or a carcass without a difference in shade.
  • Phased installation: working floor by floor and the certificate after assembly preserve the building's occupancy and keep the paperwork in order.

12Calculation

How to calculate the cost of furniture for a hotel

In the calculator, select item numbers and their quantity per floor — the calculation will go to the manager on WhatsApp, who will clarify the decor, fabrics and wholesale price for the series.

01Type
02Quantity, pcs of identical items
1 pc
130 pcs
03Carcass
04Fronts
05Hardware
06Options

13For business

What else we make besides hotel furniture