
Temirzhan Nurpeisov
Furniture assembly carpenter11 years
★ 4.81 · 47 ratings
For business · Hotels
We furnish rooms, lobby and reception with one series: first a pilot room, then the whole floor in one decor. Measurement and 3D design are free, the price is fixed in the contract, warranty on the item is 24 months.
Measurement and 3D design are free and carry no obligation · price fixed in the contract · Kaspi Instalments up to 24 months
01Types
02Hotel projects
Property type, volume, materials and lead time — per project.
03How we work with hotels
04Prices
The "from" price is for one item in the base configuration: laminated chipboard carcass, PVC edge on all ends and hardware. A wholesale price applies to a series of rooms, and the final amount is fixed in the contract after a free measurement.
05For businesses
We work with LLPs and sole traders on bank transfer. The price, materials and lead times are in the contract before production starts: the furniture fits into the property's opening schedule.
Request a contract and invoice06Principles






01 / 06
07Production
Six steps in our 600 m² workshop. You can see each of them with your own eyes: the showroom and production are under one roof.
08Team
MEBLIX workshop craftsmen who make and assemble furniture to order.
01 / 0709FAQ
Didn’t find the answer? Message us — a manager replies, not a bot.
Ask on WhatsAppYes, that's how we work: first we make a pilot room and get it approved, then we launch the series for the floor. Later we accept repeat orders for the same series using the same drawings and the same decor.
We sign a contract and issue an invoice for bank transfer. 50 % prepayment, the remaining 50 % — after signing the acceptance act, which we sign after installation. Closing documents — the act and the invoice.
It depends on the set: the price list above includes a hotel bed and a bedside cabinet, plus a wardrobe, desk and minibar. We calculate the exact estimate for a room and a series after a free measurement, and a wholesale price applies to a series.
Yes. For short stays an open walk-in closet area instead of a wardrobe, a luggage rack and a compact cabinet is often enough — it's cheaper and quicker to clean. We select the set during the measurement to fit the room's area.
Yes. We install floor by floor with our own crew: while assembly is underway on one floor, the others keep welcoming guests. We coordinate the order of floors and working hours with the hotel management in advance.
We give a 24-month warranty on the item under the contract. Blum hardware carries a 25-year manufacturer's warranty; Hettich and Boyard have their own terms — we specify which hardware is used on each item in the specification.
Yes, we also make the reception desk as a separate order, and its price is given in the price list above. We design it in two heights, with cable channels and space for the administrator's equipment, and match the decor to the existing lobby.
Yes, if time is allowed for a pilot room. The lead time for each item is shown in the price list above, and for an opening an urgent order is possible. We schedule installation around the hotel's launch date.
Our showroom has samples of laminated chipboard decors, fabrics and countertops. They're easy to compare side by side so that the rooms, corridor and lobby come together into one picture.
Not necessarily. We visit the site for a measurement free of charge and create a 3D room layout design in 1–2 days. If the hotel has a designer, we work from their drawings and approve the pilot sample with them.
10Reviews
4,9
average rating
on Google and Zoon
Everyone can see a review on the platform: this is how other people check whom to trust with an order. If something went wrong, write to us and we will reply within 1–2 business days.
Message us on WhatsApp11Article
MEBLIX makes hotel furniture in its own 600 m² workshop in Almaty: beds, wardrobes, cabinets, minibars, reception desks and soft lobby furniture. Before the series, we assemble a pilot room and approve it, produce the entire floor in one decor, install it floor by floor with our own team, and give a 24-month warranty on the item under the contract.
A guest room is conveniently divided into sleep, storage, work and luggage zones. We break down which items cover each of them and what to think about already at the planning stage.
We assemble the sleep zone from a hotel bed, a headboard and a pair of bedside cabinets — this is where the room gets its recognizable style. The bed carcass is cut from 25 mm laminated chipboard, the headboard is made of MDF, with HPL coating or soft upholstery, and the cabinets — from 16–18 mm board with PVC edge on every end. When hotel furniture is designed for a specific floor, the headboard height is selected to match the window and sconces, and the cabinet width — to match the passage between the bed and the wall. A full-wall headboard works as a wall panel: it hides wires, protects the wallpaper from hits by the backrest and sets the rhythm of a corridor of identical doors. Sockets, switches and cables to the TV are laid into the headboard and TV panel with a cable channel already in the design — moving them after installation means drilling into the finished series.
In a tight room we install a sliding wardrobe or an open wardrobe area instead of a hinged wardrobe so the doors don't eat up the passage. A sliding wardrobe with a mirror door also replaces a separate mirror, and inside we leave a niche for a safe and a suitcase. The open area — a rail, a shelf and a couple of hooks — suits a hostel or a mini-hotel where a guest stays one or two nights. We make the minibar cabinet with a ventilation niche: the fridge needs air, otherwise it heats the carcass and makes noise at night. The bench by the bed is upholstered in anti-vandal fabric, the luggage rack is assembled on textile straps — suitcase wheels and locks don't scratch the board. Such furniture for hotel rooms is produced by us as one series in one decor, so the wardrobe, cabinet and luggage rack match in shade. The luggage rack is best placed at the entrance or by the wardrobe, not by the bed: an open suitcase there blocks the way to the bathroom.
| Item | Zone | What we check |
|---|---|---|
| Bed with headboard | Sleep | Headboard height, socket outlets |
| Bedside cabinet | Sleep | Drawer runners, edge on ends |
| Wardrobe or sliding wardrobe | Storage | Niche for safe and suitcase |
| Minibar cabinet | Storage | Ventilation niche for the fridge |
| Desk and mirror console | Work | HPL on the countertop, LED lighting |
| Luggage rack and bench | Luggage | Straps, washable fabric |
In a hotel, surfaces are wiped every day, and suitcases are rolled along the corners of wardrobes. We show what we make carcasses, countertops and frames from so they survive such a regime without chips and swelling.
We cut the carcasses from E1-class Egger and Kronospan laminated chipboard 16–18 mm thick, and we seal all edges — not just the front ones — with 2 mm PVC edge banding. The board's melamine coating withstands wet cleaning, but laminated chipboard has one weak spot: an exposed cut absorbs water and swells. That is why hotel furniture never leaves our workshop with a bare edge, even where it is not visible — at the back panel, under the plinth, on the inner shelves. The 2 mm edge is thicker than a decorative one and takes the hit of a vacuum cleaner or a suitcase wheel without peeling at the corner. Cutting and edge banding run in our own section of the workshop, so we set the thickness and type of edge ourselves rather than taking whatever a subcontractor has. When choosing a decor, it is worth looking at the sample in daylight: gloss shows every fingerprint, while a matte woodgrain structure forgives marks from a cloth.
We finish work desks, consoles and the tops of minibars with HPL laminate or solid surface: such surfaces do not fear hot cups, spilled coffee or daily cleaning with detergents. HPL is a high-pressure laminate, harder than melamine, and it does not dent under a handle or a suitcase leg. We use solid surface where a seamless one-piece top is needed — on the console by the mirror or the stand in the lobby. We cut countertops 25 mm thick: on such a sheet no sag is visible, even if the work desk runs along the whole wall under the TV. The higher the room category, the more often the client asks for stone, but in standard rooms HPL serves just as well. It is better to round the countertop edge where elbows rest — a right angle in a walkway is the first to take hits and chips.
| Material | Where it goes | What it withstands |
|---|---|---|
| E1 laminated chipboard 16–18 mm | Wardrobe, nightstand and bed carcasses | Wet cleaning, impacts with edge banding |
| HPL laminate | Countertops, TV panels, reception | Heat, spills, scratches |
| Solid surface | Consoles, stands | Water, stains, seamless joints |
| Contract fabric, faux leather | Sofas, armchairs, benches | Frequent cleaning, abrasion |
| Powder-coated steel | Side tables, hangers, legs | Load, washing, corrosion |
A floor of dozens of identical rooms repeats any mistake as many times as it has doors. Here is how we check a series before launch and how we keep the same decor on a repeat order.
Before the series we make a pilot room sample and sign it off with the client — only after the signature do we launch the batch. The pilot is assembled from the same boards, edge banding and hardware that will go into production, so it shows the real shade of the decor under the light of a specific building, not a picture in a 3D design. In it they check how the wardrobe doors open next to the bed, whether there is enough room for the housekeeper's cart, at what height the sockets end up by the headboard. Everything changed in the pilot we carry over into the series drawings, and every item passes a test assembly in the workshop before dispatch. Why spend time on a single sample? A fix in the pilot is one part, while a fix after the series is released is the whole batch and a second installation.
We produce a hotel floor as one series in one decor, under one estimate and one contract per property. Furniture for hotels is usually ordered in stages: first one floor or building, then the next a season later, and the guest should not notice that the rooms were made at different times. For this we accept a repeat order into the same series later — using the same drawings and the same hardware. Board batches from one manufacturer may differ slightly in tone, so with a repeat order we compare the new sheets against a sample from the first batch. The wholesale price is calculated per series, not per individual item. It is worth fixing the decor, edge banding and hardware article numbers in the contract specification: it is a short list that a year later will save you from hunting for that very shade.
The welcome area works around the clock and sees more people than any room on a floor. Here is how we make the check-in desk, sofas and coffee tables for such a flow.
We make the reception desk from 25 mm laminated chipboard with HPL on the work surface and a milled facade — passports, key cards, bags and elbows slide across it every day. It is designed at two heights: the upper level for the guest filling in a form while standing, the lower one as the administrator's workplace with a monitor and terminal. Inside we allow for cable channels, document drawers and space for a printer, so cables do not dangle under the countertop. The logo and lighting are built into the facade at the design stage, and the corner of the desk that suitcases most often hit is reinforced with edge banding and a rounded profile. The desk is the largest item in the lobby, and it is fully assembled at our control assembly before being taken apart for delivery. It is worth deciding in advance how many administrators work the peak shift: the length of the lower level depends on it.
We build the lobby's upholstered furniture on a frame of plywood and timber with high-density PU foam and cover it in contract anti-vandal fabrics or eco-leather that can be washed. Ordinary furniture fabric in a hall quickly wears through on the armrests and collects coffee stains, while contract fabric is designed for frequent cleaning. The dense filling does not sag where people sit dozens of times a day — the seat stays even after several seasons. Next to them we place coffee tables with an HPL top on a powder-coated steel frame: they are safe to wipe down and move across the floor. Such furniture for hotels holds its shape without removable covers that later have to be washed and fitted. It is more convenient to compare fabric and eco-leather samples in the showroom, placing them next to the desk decor — that way you can see whether the lobby comes together into one picture.
You can replace the furnishings without closing the whole building or losing occupancy. We describe the measurement, the design and the floor-by-floor installation sequence so that guests in neighbouring rooms barely notice a thing.
We measure the site and produce a 3D room layout design free of charge, and it takes 1–2 days. On site we measure the walls, niches, window reveals, electrical outlets and bathroom doors, because even within one building rooms of the same type often differ by a few centimetres. The design shows how the bed, wardrobe, desk and minibar fit in, where the guest will walk and where the housekeeping trolley will turn. From the same design we calculate the budget for the whole floor and prepare drawings for the pilot sample. If the building has several room types — standard, double, family — each type should be measured rather than copying the dimensions of one onto all: a mistake in a wardrobe niche can later only be fixed by reworking the carcass.
In a working hotel we install the furnishings floor by floor with our own team — no subcontractors who don't know the project. While assembly is underway on one floor, the others keep taking guests; we agree the schedule with management around occupancy and season. We make hotel furniture in our own 600 m² workshop in Almaty, and every item undergoes a test assembly before dispatch, so on site the team assembles pre-checked units rather than adjusting them on the spot. Delivery in Almaty and up to 30 km is free on a large order, beyond that for an extra charge. For a new building opening, we schedule installation around the launch date. The more precisely the floor sequence is agreed in advance, the fewer rooms are out of sale at the same time.
For a LLP and sole proprietor it matters what paperwork remains in hand after the order and how payments are structured. We describe the contract, the payment procedure and the warranty on items and hardware.
For LLPs and sole proprietors we work under a contract and invoice, with non-cash payment. The prepayment is 50 %, and the remaining 50 % is paid after the acceptance certificate is signed, and we sign the certificate after installation. The closing documents are the certificate and the delivery note, and they are enough for the hotel's accounting department to put the furnishings on the books. The entire series for the property goes under one estimate and one contract, so you don't have to reconcile a dozen separate invoices for beds, wardrobes and the reception desk. Prices for each item are in the price list above on this page, and the lead times for each option are listed there too, and a rush order is also possible. Tying the second payment to the certificate is convenient for the customer: the money goes for a floor that has been assembled and accepted, not for parts that are yet to be assembled.
We give a 24-month warranty on items under the contract — it is written into the same document as the series specification. Over 13 years we have completed more than 3 500 projects, and we have made furniture for hotels in Almaty for 20+ hotels and treat such orders as a separate load class. We fit hinges, lift mechanisms and drawer runners from Blum, Hettich or Boyard. Blum has a 25-year manufacturer's warranty, Hettich and Boyard have their own, so the specification should show which hardware goes on which items. For wardrobe doors and cabinet drawers that are opened many times during a cleaning shift, this is not a formality: it is the mechanisms that wear out before the carcass. If a repeat order is needed later, the warranty is calculated for the new batch under its own contract.
A ready-made series suits a hotel if the rooms are standard sizes and style does not matter for positioning. A catalogue set is delivered faster, but it rarely fits real niches: the wardrobe leaves a gap to the wall, the bed blocks a socket, the cabinet does not fit by the window. Custom furnishings are designed to the measurements of each room type, in the chosen decor and with the required board thickness, so they are easier to reorder and repair from the same drawings. For a hostel with an open wardrobe and standard beds the difference is smaller, for a boutique hotel with full-wall headboards it is more noticeable. It is fairer to compare options not by the price of the set, but by how many years the room will stand without replacing fronts and edge banding.
Hotel furnishings pay off when they are designed for real rooms, the load and the building's operating schedule. Below is a short list of what to keep in mind before ordering, budgeting and agreeing the project with the manager.
12Calculation
In the calculator, select item numbers and their quantity per floor — the calculation will go to the manager on WhatsApp, who will clarify the decor, fabrics and wholesale price for the series.
13For business