Almaty Daily 10:00–20:00 +7 705 625 00 03 Book via WhatsApp
Washing machine under a shared countertop with an inset sink and a cabinet with drawers

Custom cabinet for a washing machine in Almaty

We will design a cabinet for your washing machine down to the millimeter: free measurement and a 3D project in 1–2 days. The price is fixed in the contract, 24-month warranty on the item.

Measurement and 3D design are free and carry no obligation · price fixed in the contract · Kaspi Instalments up to 24 months

★ 4,9
Google rating
from 7 days
lead time
24 mo.
warranty under contract

02Prices

How much it costs to order a cabinet for a washing machine

The "from" price depends on the width per linear metre or on the specific item. After a free measurement we fix the price in the contract so it does not change.

  • 50% prepayment, the rest after installation and sign-off
  • Kaspi, card, cash, bank transfer for companies
  • 1–2 days for a 3D design, revisions free
  • Kaspi Instalments over 3–24 months with no down payment
Get an exact quote
ItemMaterialLead timePrice
  • Solid surface countertop above the machine (per linear m)solid surface10–14 daysfrom 25 000 ₸/⁠linear m
  • Flat sink above the machine (selection)ceramic/​cast stonewith the itemfrom 28 000 ₸
  • Podium stand for a washing machine with a pull-out drawer 63×​63×​15 cmMoisture-resistant laminated chipboard, reinforced construction7–10 daysfrom 30 000 ₸
  • Single-door wall-mounted cabinet above the machine 60×​35×​70 cmFilm-wrapped MDF7–10 daysfrom 38 000 ₸
  • Cabinet for a washing machine 60×​60 cm with a pull-out drawerMoisture-resistant laminated chipboard (16 mm)7–10 daysfrom 55 000 ₸
  • Unit above the machine with a sinkmoisture-resistant laminated chipboard10 daysfrom 95 000 ₸
  • Tall column cabinet above the washing machinemoisture-resistant laminated chipboard12 daysfrom 110 000 ₸
  • Unit with stone countertoplaminated chipboard, solid surface12 daysfrom 125 000 ₸
  • Linear unit: machine + cabinet + sinkLaminated chipboard, MDF14 daysfrom 140 000 ₸
  • Linear unit with a stone countertopLaminated chipboard, stone14 daysfrom 180 000 ₸

03Calculator

What makes up the price of bathroom furniture with a washing machine

In the calculator, choose the calculation type — by linear metre of width or per ready-made item. Enter the niche dimensions and the desired material, then send the result to the manager on WhatsApp for confirmation.

01Type
02Width, m including the machine
1,2 m
0.62.4 m
03Carcass
04Fronts
05Hardware
06Options

04Projects

Completed projects of cabinets for a washing machine

01 / 05
Tall column unit above the machine — MEBLIX project, khrushchyovka, Almaly district

01 / 05

Tall column cabinet above the washing machine

khrushchyovka, Almaly district

A narrow niche but a high ceiling: the washing machine below, above it a tall column cabinet for cleaning products and towels up to the ceiling.

Items
column above the niche, washing machine below, shelves on top
Materials
moisture-resistant laminated chipboard
Lead time
12 days
I want the same
Unit with a stone countertop — MEBLIX project, Samal-2 microdistrict

02 / 05

Unit with stone countertop

Samal-2 microdistrict

A stone countertop with an overhang above the washing machine — splashes run down in front of the machine, not onto the hatch. The carcass is fixed to the wall.

Items
unit above the washing machine, stone countertop
Materials
laminated chipboard, solid surface
Lead time
12 days
I want the same
Unit with side drawers — MEBLIX project, Esentai City residential complex

03 / 05

Unit with side drawers

Esentai City residential complex

A block of soft-close drawers was added to the unit above the washing machine — storage at hand, nothing gets lost.

Items
unit above the washing machine, drawer block
Materials
moisture-resistant laminated chipboard, gloss
Lead time
12 days
I want the same
Moisture-resistant cabinet unit — MEBLIX project, Almaty Arena residential complex, Alatau district

04 / 05

Moisture-resistant cabinet unit

Almaty Arena residential complex, Alatau district

All cut-outs for the drain and plumbing are sealed — the cabinet works in damp conditions on both sides and does not swell.

Items
linear unit, moisture-resistant carcass
Materials
moisture-resistant E1 laminated chipboard
Lead time
13 days
I want the same
Compact unit for a 3 sq. m bathroom — MEBLIX project, khrushchyovka on Gagarina

05 / 05

Compact unit for a 3 sq. m bathroom

khrushchyovka on Gagarin

A three-square-metre bathroom — the washing machine was hidden under the sink, and the cut-out for the riser pipe was made on site. Nothing blocked the passage.

Items
unit above the washing machine, cut-out for the riser
Materials
moisture-resistant MDF
Lead time
12 days
I want the same

3 500+

MEBLIX projects since 2013 — we will show you washing machine units similar to yours on WhatsApp or in the showroom.

Show similar

05Principles

How custom bathroom furniture differs from ready-made

  1. 01

    Vibration isolation from the spin cycle

    We damp vibration from the spin cycle: a thick countertop, pads under the machine's feet and the cabinet fixed to the wall. This reduces noise and prevents the fronts from warping.

  2. 02

    Planning the utilities before measurement

    We determine in advance the position of the inlet hose, drain and socket relative to the machine's carcass. That way the cabinet won't need redoing after installation.

  3. 03

    Load distribution in the carcass

    We place the machine closer to the load-bearing wall, heavy drawers at the bottom and the sink in the centre of the countertop. The centre of gravity stays put and the fronts don't warp.

  4. 04

    Precise fitting to the niche

    We measure the room taking into account uneven walls and utilities, so the cabinet fits with no gaps or clearances. This matters especially in Almaty's small bathrooms.

  5. 05

    Repairability of parts

    We mount the fronts and shelves on Blum, Hettich or Boyard hardware so that, if needed, a component can be replaced without replacing the whole carcass. Removable parts make maintenance easier.

  6. 06

    Installation with utilities in mind

    During on-site assembly, the craftsmen trim the panels around pipes and sockets and seal the joints. This protects the edges from moisture and keeps the look neat.

06How ordering works

How to place an order for a cabinet for a washing machine

Book a free measurement
  1. 01

    5 minutes

    Consultation

    Message us on WhatsApp or call. We discuss the task, style and budget, show similar projects and give a price estimate.

  2. 02

    within 24 hours

    Measurement

    The measurer comes free of charge anywhere in Almaty, takes laser measurements accurate to 1 mm, and marks sockets, pipes and uneven walls. Brings samples.

  3. 03

    1–2 days

    3D design and estimate

    We show the furniture in its colours and materials and make changes free of charge until you approve. Price, lead time and installation date are fixed in the contract.

  4. 04

    from 7 days

    Production

    The cabinet parts are made to your 3D design, and before dispatch the carcass is assembled and checked in the workshop. The craftsman gives the exact lead time when you order; for lead time guidelines see the price list.

  5. 05

    1 day

    Delivery and installation

    We deliver, bring it in, assemble, adjust the drawers and level the machine in the niche. After installation we clean up.

  6. 06

    24 months

    Sign-off and warranty

    You check every mechanism, sign the certificate and pay the balance. The warranty starts that day, with service response within 1–2 business days.

A stack of moisture-resistant Egger and Kronospan laminated chipboard boards in our workshop warehouse before cuttingA CNC machine cuts the moisture-resistant laminated chipboard board into carcass partsThe edgebanding machine seals the ends of the carcass parts with PVC edging in the MEBLIX workshopA craftsman coats MDF fronts with enamel in our workshop's spray boothA craftsman checks the test assembly of the carcass in the workshop before shipping to the customerA finished wall-mounted cabinet with ribbed drawers and a countertop under a bathroom sink

01 / 06

07Production

How the production of bathroom furniture works

Six steps in our 600 m² workshop. You can see each of them with your own eyes: the showroom and production are under one roof.

  1. A stack of moisture-resistant Egger and Kronospan laminated chipboard boards in our workshop warehouse before cutting
    01

    Egger · Kronospan · E1

    Board

    Egger and Kronospan boards of emission class E1 arrive at the workshop warehouse. 40+ laminated chipboard décors, 16–18 mm thick.

  2. A CNC machine cuts the moisture-resistant laminated chipboard board into carcass parts
    02

    Laser measuring to 1 mm

    CNC cutting

    A design engineer prepares the drawings, and the machine cuts the board to them. Dimensions come from a laser measurement accurate to 1 mm.

  3. The edgebanding machine seals the ends of the carcass parts with PVC edging in the MEBLIX workshop
    03

    Blum · Hettich · Boyard

    Edging and drilling

    The edge-banding machine seals the edges, then we drill holes for Blum hinges and Hettich runners.

  4. A craftsman coats MDF fronts with enamel in our workshop's spray booth
    04

    Any RAL colour

    Enamel and veneer

    A finishing specialist paints the fronts to RAL — matte and gloss. We seal the board edges so moisture from the bathroom doesn't get into the cut of the laminated chipboard and the furniture doesn't swell.

  5. A craftsman checks the test assembly of the carcass in the workshop before shipping to the customer
    05

    Pre-assembly in the workshop

    Assembly and inspection

    We assemble the modules in the workshop before dispatch, checking front gaps and drawer travel. The quality control department signs the item off for shipping.

  6. A finished wall-mounted cabinet with ribbed drawers and a countertop under a bathroom sink
    06

    Installation in 1 day

    Your cabinet

    We deliver, bring it in, assemble in 1 day, level the machine in the niche and clean up. Warranty of 24 months from signing the acceptance certificate.

08Team

Who will make your bathroom furniture

MEBLIX workshop craftsmen who make and assemble furniture to order.

01 / 07
Aidyn Bolenov, Cabinet furniture repair craftsman

Aidyn Bolenov

Cabinet furniture repair craftsman20 years

★ 4.99 · 73 ratings

Aleksandr Martynenko, Furniture and kitchen unit assembler

Aleksandr Martynenko

Furniture and kitchen unit assembler23 years

★ 4.97 · 300 ratings

Andrei D., Made-to-order furniture maker

Andrei D.

Made-to-order furniture maker7 years

★ 4.26 · 32 ratings

Akzholtai U., Furniture maker

Akzholtai U.

Furniture maker5 years

★ 4.23 · 30 ratings

Vasilii Krasnov, Joiner and carpenter

Vasilii Krasnov

Joiner and carpenter20 years

★ 5.0 · 113 ratings

Viktor Gurov, Furniture front and hardware fitter

Viktor Gurov

Furniture front and hardware fitter17 years

★ 4.61 · 92 ratings

09Materials

What boards and finishes are used for bathroom furniture

Hardware by Blum, Hettich, Boyard · boards by Egger, Kronospan. 200+ front samples in the showroom to see and touch.

  • Sample of moisture-resistant laminated chipboard with a wood décor for the carcass and shelvesLaminated chipboardclass E1, 16–18 mm, 40+ decors
  • Sample of an MDF front in PVC film with sealed endsFilm-wrapped MDFmilling, patina
  • Sample of a smooth MDF front in matte enamel in a light shadeEnamelled MDFany RAL colour, matte or gloss
  • Sample of a front with a plastic coating that resists water splashesHPL laminatewear-resistant
  • Sample of artificial stone for a countertop under a bathroom sinkSolid surfaceseamless joints
  • Sample of quartz agglomerate for a durable bathroom countertopEngineered quartz93% quartz

10Article

Custom washing machine vanity from MEBLIX in Almaty

Temirzhan Nurpeisov, Furniture assembly carpenter
Author
Temirzhan NurpeisovFurniture assembly carpenter
Published
Updated

A custom washing machine vanity is built to the exact dimensions of your appliance and bathroom, not a catalogue size. We measure the space, design a 3D project, manufacture the body in our own workshop and install it with our own crews. Moisture-resistant boards and Blum fittings are used.

How a washing machine vanity is built and which layouts work

A washing machine vanity is not a shelf placed over an appliance. It is a body with calculated clearances, a load-bearing top and service access. Here are the three layouts that work and what decides the choice between them.

Three layouts for fitting a washer and a sink into one run

  • Sink directly above the machine: the most compact option, with the bowl set into the top and the unit sliding in below on its own feet.
  • Separate bay beside the sink cabinet: two bodies joined by one continuous countertop, so each section is levelled and serviced on its own.
  • Single combined carcass: a bespoke washing machine vanity from our workshop that holds the bowl and the machine in one body, with a shared base and one front line.

What height works for the countertop and the machine underneath

We set the countertop height around the machine first and the comfortable working height second, because a unit that does not fit under the top cannot be fixed later. The carcass is drawn to the exact dimensions of the specific model — its width, depth and lid clearance — rather than to a nominal size. A built-in unit needs a few centimetres of air above it and a top that stays level across the whole run, so the bowl sits flush and the machine still slides in and out without scraping the frame. The working surface then follows from that figure, not the other way round. Check the manual before the drawing is signed off: the clearance above the lid matters more than a taller cabinet.

Freestanding, wall-hung or on a plinth

We recommend a plinth or adjustable legs for any body that carries a washer, and reserve wall-hung designs for the sink-only sections of the run. The machine vibrates on spin, so the support has to reach the floor and be levelled to it — a hung cabinet transfers that movement into the wall and the fixings. Adjustable legs handle the slight slope that most bathroom floors in Almaty have, and a recessed base hides them while keeping the front line clean. Brackets and fixings still tie the body to the wall for stability, but they carry no appliance weight. On an uneven floor, level the base first and set the carcass on it — shimming a hung unit never removes the movement.

Depth, siphon and the sink-over-washer rule

Depth is the one dimension that decides whether a basin can sit above a washer at all. Below is the rule we work to and what it means in practice.

How much shallower the washer must be than the sink

We plan the appliance to sit noticeably shallower than the sink above it, so the trap and the supply lines have room behind the machine instead of pressing against its back panel. In a body built for a 60 cm unit we leave a service zone at the rear for the drain hose, the water inlet and the shut-off valves, then set the bowl forward of that zone. The rim and the loading door then line up on one plane, which is what keeps the run looking deliberate rather than bolted together. If the two depths match, the siphon ends up ahead of the unit and the cabinet has to grow outward — which eats floor space in a small bathroom.

What the countertop over a washer actually carries

The top over a machine is a working surface, so we support it on the side panels and a rear rail rather than on the appliance itself. A slab spanning a 60 cm opening with a bowl cut into it needs a continuous bearing edge along both sides, and the back rail takes the load where the cut-out and trap sit. On our bathroom vanities the board is Egger or Kronospan, cut and edged in the workshop, with the ceramic fixed down through the same structure. Nothing should rest on the lid — the worktop has to bridge over it with a gap, otherwise the unit's own vibration is transmitted straight into the surface and the seal around the sink.

Matching body depth to appliance depth

How the three depths stack up
ElementWhat we allow for
ApplianceCabinet depth plus service gap
Sink bowlSet ahead of the trap zone
Cabinet bodyDeepest of the two, plus door thickness
WorktopOverhang past the front line

Moisture-resistant materials and edge protection

A bathroom is a wet zone, and a vanity body survives there not because of a special board but because of sealed edges and protected cut faces. We build to that logic, and here is what goes into the body.

Which boards we use for a bathroom body

We build bathroom bodies from moisture-resistant Egger and Kronospan boards, and we pick the wet-zone grade rather than standard furniture board for the carcase. The panel carries the load of the countertop, the sink and the machine beside it, so the core has to hold its shape when the room stays humid for hours after every shower. Egger and Kronospan both make a moisture-resistant line with a denser core and a lower swell rate than the standard chipboard used in dry rooms. We specify that grade for the sides, the base and the plinth, and keep the standard board for parts that never meet water. The board itself is only half the answer — an unprotected cut edge will swell long before the face of the panel shows any damage.

Why the edge banding decides how long the body lasts

Every cut edge on a bathroom body gets banded in our workshop, because the raw core is where water gets in first. A panel cut for the machine opening, the siphon and the pipe entries exposes bare chipboard, and that exposed core absorbs moisture far faster than the laminated face. Our own 600 m² workshop does the cutting, the edge banding, the painting and a control assembly before anything ships, so the banding is applied in-house and inspected at the same bench. We band the visible edges and the hidden ones alike, and we seal the cut-outs around pipes rather than leaving them raw. Pay attention to the edges you cannot see — the underside of the top, the back of the plinth and the cut-outs for pipes are the places that fail first.

Fittings that survive steam and daily use

  • Blum hinges and lift systems: we fit Blum on the doors and the flap above the machine, and the manufacturer backs these mechanisms for 25 years.
  • Drawer runners: Blum runners carry the drawers, with Hettich and Boyard as alternatives when a project calls for a different specification.
  • Warranty split: the 25-year cover applies to Blum hardware specifically — it protects the mechanism, not the board the screws go into.

Ventilation, access and hiding the plumbing

A washer sealed inside a cabinet has to breathe and stay serviceable. Here is how we plan the gaps, the reach to the filter and the space the hoses need.

The gap and airflow a washer needs inside a cabinet

We leave a service gap around the appliance and keep the bay open at the back and top so damp air does not sit against the machine. In our designs the washer stands off the side walls by a working gap, and the top of the bay stays open toward the room rather than closed with a lid. That path lets warm, moist air from a spin cycle escape instead of settling on the housing. A sealed bay traps condensation on the cold metal of the washer, and that moisture then works on the nearest board edges. When we plan a custom washing machine vanity, the airflow route is drawn before the layout, not after. On the models we fit, the rear needs a few centimetres of open space for the inlet and drain to sit without a sharp bend.

Reaching the door, the detergent drawer and the filter

The face of the washer stays fully accessible in our designs, and the filter hatch is reachable without removing a part. A front-loading door needs room to swing, so we keep the countertop overhang shallow enough that the door opens past ninety degrees. The detergent drawer pulls straight out, which means nothing fixed — no handle rail, no decorative strip — should sit in that line. The filter is the part most often blocked by a fixed panel, so we mark its position on the drawing while the plan is still flexible. Check the filter position before the layout is fixed — on some models it sits low and off-centre, and a side wall can end up right opposite it. A small hinged or lift-out hatch in the plinth solves this without breaking the run of the facade.

Where the hoses, valves and trap go

We hide the supply hoses, valves and trap behind a removable false panel, so the plumbing is out of sight but still serviceable. The supply valves sit in the bay beside the machine, reachable by hand once the cover is lifted away, and the drain hose runs to the trap with a gentle fall rather than a loop that holds water. A panel that is screwed shut is worse than no panel at all — it has to come away without tools when a hose needs replacing. In our workshop the false front is cut and edged like the rest of the body, then checked in the control assembly before the unit ships. We keep the shut-off valves where a hand can reach them, because a supply that cannot be closed in a hurry turns a small leak into a floor of water.

Ordering washing machine cabinets from measurement to installation

A ready-made cabinet does not adapt to the room — the room has to adapt to it, and it rarely does. Here is how we account for an uneven surface and the appliance, and how the order runs.

Fitting tight to walls that are not straight

We measure the actual wall line at several points and cut the body to follow it, so the cabinet meets the surface without a filler strip of gaps. The survey records the deviation at the floor, at counter height and at the top, because a partition can lean one way at the bottom and the other way above. Panels are then trimmed to those figures in our own workshop, and the visible side is set to the tightest point of the run. A deviation of a couple of centimetres over the length is normal in Almaty apartments — it only becomes a problem when the body is ordered to a nominal size. Ask for those figures to be written into the drawing, not just discussed on site.

Made to measure against a ready-made cabinet

Catalogue unit against a body built to your room
Ready-madeMade to measure
Fixed catalogue width and depthShell built around your washer
Filler strips close the gapSide panel cut to the wall line
Filter access decided by the factoryFilter and valve access planned in
Sink opening pre-cut to one sizeOpening cut for your basin and tap

From measurement to the signed acceptance act

  • Free measurement and 3D project: we visit, take the wall and appliance figures and show the layout in 1–2 days.
  • Manufacturing in our own 600 m² workshop: cutting, edge banding, painting and a control assembly before shipping.
  • Installation by our own crews: the team that built the piece sets it in place and connects it.
  • Acceptance act after installation: you check the fit, the doors and access, then sign.
  • Warranty of 24 months under the contract: the terms sit in the same document you sign.

The bottom line on washing machine cabinets

A vanity built around a washer comes down to a handful of decisions — layout, materials, airflow and fit — and each one is settled before cutting starts, not after.

  • Appliance size against basin size: the machine must sit shallower than the bowl above it so the worktop clears the lid and the hoses stay reachable.
  • Board and edge protection: moisture-resistant board with sealed edges on every cut, since steam attacks exposed cores first.
  • Airflow and service access: a ventilation gap, a free path to the filter and a reachable detergent drawer, planned into the cabinet rather than cut in later.
  • Wall survey: measure at several points along the run, because walls in flats across the city rarely read straight over a full length.
  • Signed acceptance after installation: check door alignment, drawer travel and the gap around the machine before the act is signed and the balance is settled.

11FAQ

What people ask about ordering a cabinet for a washing machine

Didn’t find the answer? Message us — a manager replies, not a bot.

Ask on WhatsApp
01Can a cabinet for a washing machine be built into an existing set?

Yes, if the dimensions and colour match. To fit into an existing row, we need the exact niche dimensions and a board sample — the specialist will match the shade of Egger or Kronospan laminated chipboard to your kitchen set. If the board has been discontinued, we'll find the closest alternative or make the cabinet in a contrasting colour.

02What gap is needed between the machine and the cabinet walls?

We leave 1–2 cm on the sides and at least 2–3 cm on top for ventilation and hoses. We make the cabinet depth to suit the machine model: the standard is 60 cm, but for units with a protruding door or rear pipes we adjust the size during the measurement.

03What should I do if the machine stands on an uneven floor?

We level the cabinet, and the machine itself is adjusted with its feet — otherwise vibration appears during the spin cycle. If the floor difference is more than 1 cm, the specialist will suggest a plinth base with a reinforced construction made of moisture-resistant laminated chipboard: it distributes the load and dampens vibrations.

04Where should the hoses and socket go when installing the cabinet?

We place the socket above the countertop level or in the adjacent cabinet — direct access to it must not be blocked by the machine. We route the supply and drain hoses into the niche behind the cabinet with extra length: when the machine is moved out for repair, the slack should not be stretched.

05Can a countertop with a sink be made above the washing machine?

Yes, a flat ceramic or cast stone sink is suitable for this — it takes up minimal depth and does not interfere with opening the door. We make the artificial stone countertop with a cut-out for the bowl and a hole for the mixer tap; we calculate the height of the unit so that the machine can be pulled out freely for servicing.

06How do I care for moisture-resistant laminated chipboard in the bathroom?

Wipe the surfaces with a soft cloth without abrasives, and keep the joints and edges dry — moisture-resistant Egger or Kronospan board withstands splashes, but standing water on the ends shortens its service life. Check the sealant around the sink every six months and renew it if necessary.

07How long does it take to make a cabinet for a washing machine?

A cabinet for a washing machine is usually made of moisture-resistant laminated chipboard — this is the fastest option, 5–14 days from project approval. If you need a colour or texture from film-wrapped MDF, the lead time increases to 10–20 days, and enamel takes longer to dry — up to 45 days. On average we complete such orders in 14–25 working days; if it's urgent, the specialist can start work from 10 days, but will confirm the exact date after the measurement.

08Can I order just a plinth stand without the cabinet?

Yes, the plinth base with a drawer is a separate item and can be ordered on its own. For a guide price, see the price list on this page.

09What can I see in the showroom before ordering a cabinet?

In the showroom at 115/60 Abylai Khan Ave we present samples of Egger and Kronospan boards, Blum and Hettich hardware, and edge banding and coating options. Here you can also compare the shades of moisture-resistant laminated chipboard and film-wrapped MDF to choose the material for your bathroom interior.

10What materials and hardware do you use for washing machine cabinets?

For the cabinets we use moisture-resistant Egger and Kronospan boards, and Blum, Hettich and Boyard hardware. Moisture-resistant laminated chipboard is suitable for the bathroom, while film-wrapped MDF gives more options for colour and texture. Blum hardware comes with a 25-year manufacturer's warranty, and the item itself with a 24-month warranty under the contract.

12Reviews

What clients say about washing machine cabinets

4,9

average rating
on Google and Zoon

See all reviews
MEBLIX showroom on Abylai Khan Ave

13Showroom and workshop

Touch the samples for washing machine cabinets in our showroom

200+ fronts and materials, Blum and Hettich hardware to try in person. The workshop is in the same building.

Address
115/60 Abylai Khan Ave, Almaty
Hours
Daily 10:00–20:00
Phone
+7 705 625 00 03

14Other pages

What else we make besides washing machine cabinets